Contract Amount: $511,145
Mechanical Designer: Geren Associates/CRS
Architect: Geren Associates/CRS
General Contractor: Emerson Construction
Contract Amount: $276,684
Mechanical Designer: Adams, Reid
Architect: Geren Associates
General Contractor: Smithfield Construction
Contract Amount: $680,000
Mechanical Designer: Blum
Architect: Halbach Dietz
General Contractor: The Frymire Comany
Contract Amount: $933,337
Mechanical Designer: William K. Hall
Architect: Dahl Braden PTM
General Contractor: Rodgers Construction
Contract Amount: $506,628
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Darrow-McSpedden-Sellers
General Contractor: Emerson Construction
Contract Amount: $1,286,477
Mechanical Designer: Romine,Romine & Burgess
Architect: PBK Architects
General Contractor: Charter Builders, Inc.
Contact: Bill Jones
Contract Amount: $252,223
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $70,885
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Schrickel Rollins Assoc.
General Contractor: Mission Construction Co.
Contract Amount: $377,705
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates/CRS
General Contractor: McCord-Mendenhall, Inc.
Contact: Chad Kroeker
Contract Amount: $3,500,000
General Contractor: SEDALCO
Contact: Bill Jones
Contract Amount: $1,101,039
Mechanical Designer: Friberg Associates
Architect: Komatsu Architects
General Contractor: Coronado Builders
Contract Amount: $1,059,000
Mechanical Designer: Solare Engineering Unlimited
Architect: Perkins + Will
General Contractor: Steele & Freeman Inc.
Completion Date: August 2014
Contract Amount: $177,720
Mechanical Designer: Friberg & Associates
Architect: Friberg & Associates
General Contractor: Century Mechanical
Contract Amount: $334,491
Mechanical Designer: Friberg Associates
Architect: Kirk Voich Gist
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $821,155
Mechanical Designer: Romine, Romine & Burgess
Architect: Kirk Voich Gist
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $175,500
Mechanical Designer: Multatech Engineers
Architect: Larry Garrison
General Contractor: R J Miller Construction
Architect: VAI Architects
General Contractor: SEDALCO
Contact: Chad Kroeker
Contract Amount: $2,909,044
Mechanical Designer: IEG Engineers
Architect: VLK Architects
General Contractor: Steele Freeman Inc
Completion Date: August 2012
Contract Amount: $366,000
Mechanical Designer: Jacobs Engineering Group
Architect: Jacobs Engineering Group
General Contractor: DeMoss Company
Completion Date: May 2014
Contract Amount: $195,000
Mechanical Designer: Jordan & Skala Engineers
Architect: Marsh & Associates, Inc.
General Contractor: Scott Tucker Construction Co.
Completion Date: May 2015
Contract Amount: $224,700
Mechanical Designer: Summit Consultants
Architect: Bennett Benner Partners
General Contractor: Scott Tucker Construction Co
Completion Date: January 2015
Contract Amount: $768,820
Mechanical Designer: Baird Hampton Brown
Architect: Caubke Hoskins & Loose
General Contractor: Joe R. Jones Construction
Completion Date: September 2008
Contract Amount: $484,900
Mechanical Designer: Systems Associates
Architect: Form Studios Inc.
General Contractor: FBC of Burleson
Completion Date: May 2014
Contract Amount: $2,701,648
Mechanical Designer: Baird, Hampton, Brown
Architect: Hahnfeld Associates
General Contractor: Steele Freeman, Inc.
Completion Date: February 2009
Contract Amount: $572,227
Mechanical Designer: Carter Burgess, Inc.
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $492,282
Mechanical Designer: Baird-Hampton-Brown
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.
Contract Amount: $776,601
Mechanical Designer: Friberg Associates
Architect: ID & A Associates
General Contractor: The Frymire Company
Contract Amount: $2,070,000
Mechanical Designer: Image Engineering Group
Architect: Bennett Benner Partners
General Contractor: Gatehouse Construction
Contact: Chad Kroeker
Contract Amount: $2,880,250
Mechanical Designer: DFW Consulting
Architect: HH Architects
General Contractor: Balfour Beatty Construction
Completion Date: August 2014
Contract Amount: $215,500
Mechanical Designer: Clint Hulsey
Architect: J. Douglas Cain & Associates
General Contractor: Webb General Contractors
Contract Amount: $1,559,747
Mechanical Designer: Geren Associates/CRS
Architect: Geren Associates/CRS
General Contractor: Walker Construction Co.
Contract Amount: $326,674
Mechanical Designer: Interfield Consultants
Architect: Parkey & Partners
General Contractor: Smithfield Construction
Contract Amount: $227,756
Mechanical Designer: Love, Friberg
Architect: Komatsu & Associates
General Contractor: Walker Construction Co.
Contract Amount: $553,500
Mechanical Designer: Wells Doak Engineering
Architect: Magee Architects
General Contractor: Pete Durant
Completion Date: February 2013
Contract Amount: $120,600
Mechanical Designer: TLC Engineering
Architect: Lake/Flat D Architects
General Contractor: Lincoln Builders
Completion Date: May 2014
Contract Amount: $996,600
Mechanical Designer: Century Mechanical
Architect: Haberman Jeffery Dixon
General Contractor: Overcash-Goodman
General Contractor: Steele & Freeman, Inc.
Contract Amount: $1,940,484
General Contractor: Pete Durant & Associates
Completion Date: December 2017
Contact: John Heiser
Contract Amount: $1,543,845
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Hofer Stanford
General Contractor: Steele-Freeman, Inc.
Completion Date: June 2017
Contact: Chad Kroeker
Contract Amount: $926,671
Mechanical Designer: Romine, Romine & Burgess
Architect: Romine, Romine & Burgess
General Contractor: Century Mechanical
Contract Amount: $1,056,527
Mechanical Designer: DFW Consulting
Architect: Hardy McCullah/MLM Architects
General Contractor: Bob Moore Construction
Contract Amount: $361,100
Mechanical Designer: Baird Hampton Brown
Architect: Vidaud & Associates
General Contractor: Mitchell Enterprises
Contract Amount: $474,441
Mechanical Designer: Brian Berg & Associates
Architect: Williams/Pollock Associates
General Contractor: NUCO Industries
Contract Amount: $1,715,465
Mechanical Designer: Friberg & Associates
Architect: Wharton & Lam
General Contractor: Shoemaker Construction
Contract Amount: $634,419
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Associates
General Contractor: Fisher Pearson, Inc.
Contract Amount: $981,854
Mechanical Designer: Baird, Hampton & Brown, Inc.
Architect: Quorum Architects, Inc.
General Contractor: The DeMoss Company
Contact: Bill Jones
Architect: YSM Design
General Contractor: Baxter Construction Company, LLC
Contact: Jarod O'Neill
Contract Amount: $690,090
Mechanical Designer: Larson, Binkley Assoc.
Architect: Foss, Seligson, Lafferty
General Contractor: MA Mortenson Company
Contract Amount: $345,591
Mechanical Designer: Herman Blum
Architect: Growald
General Contractor: NUCO Industries, Inc.
Contract Amount: $593,614
Mechanical Designer: Baird, Hampton, Brown
Architect: Hahnfeld Associates
General Contractor: The DeMoss Company
Completion Date: July 2009
Contract Amount: $4,123,000
Mechanical Designer: Summit Engineers
Architect: Gideon Toal, Inc.
General Contractor: Gilbane, Inc.
Contract Amount: $316,640
Mechanical Designer: Love, Friberg
Architect: Love, Friberg
General Contractor: Century Mechanical
Contract Amount: $1,184,488
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Hoffer & Stanford
General Contractor: Steele Freeman, Inc.
Completion Date: March 2009
Contract Amount: $1,532,299
Mechanical Designer: Creative Engineers, Inc.
Architect: RTKL Associates
General Contractor: Walker Construction
Contract Amount: $616,600
Mechanical Designer: Lockwood-Andrews-Newman
Architect: Daniels & Manicom
General Contractor: J. L. Spears, Inc.
Architect: Hahnfeld Hoffer Stanford Architects
General Contractor: Steele & Freeman
Contact: Jarod O'Neill
Contract Amount: $225,595
Mechanical Designer: Cash/Ridgeway
Architect: Harwood K. Smith
General Contractor: Trinity River Authority
Contract Amount: $1,186,387
Mechanical Designer: Carter Burgess, Inc.
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $579,980
Mechanical Designer: Friberg Associates
Architect: Dockstader Partnership
General Contractor: Bob Moore Construction
General Contractor: ARCO / Murray
Contact: Chad Kroeker
Contract Amount: $749,964
Mechanical Designer: William K. Hall
Architect: Hahnfeld Associates
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $296,671
Mechanical Designer: Freese-Nichols
Architect: Freese-Nichols
General Contractor: Fisher Pearson, Inc.
Contract Amount: $167,733
Mechanical Designer: Baird-Hampton-Brown
Architect: Quorum Architects
General Contractor: Fisher-Pearson, Inc.
Contract Amount: $155,522
Mechanical Designer: Baird Hampton Brown
Architect: Quorum Architects
General Contractor: Brasfield & Gorrie, LLC
Contract Amount: $2,485,424
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates/CRS
General Contractor: Walker Construction
Contract Amount: $828,865
Mechanical Designer: CCRD Engineers
Architect: HKS Architects
General Contractor: Walker/Turner Joint Venture
Contract Amount: $303,325
Mechanical Designer: CCRD Engineers
Architect: HKS Architects
General Contractor: Walker/Turner Joint Venture
Contract Amount: $127,779
Mechanical Designer: Baird-Hampton-Brown
Architect: Quorum Architects
General Contractor: Fisher Pearson, Inc.
Contract Amount: $301,151
Mechanical Designer: CCRD Engineers
Architect: HKS Architects
General Contractor: Walker/Turner Joint Venture
Contract Amount: $231,100
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Walker Building Corp.
Contract Amount: $361,100
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Walker Building Corp.
Contract Amount: $379,911
Mechanical Designer: Carter & Burgess, Inc.
Architect: Morris/Aubry
General Contractor: Walker Construction
Contract Amount: $554,465
Mechanical Designer: Baird Hampton Brown
Architect: Baird Hampton Brown
General Contractor: Century Mechanical
Contract Amount: $127,750
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Walker Building Corp.
Contract Amount: $476,696
Mechanical Designer: CES Way
Architect: CES Way
General Contractor: CES Way International
Contract Amount: $832,238
Mechanical Designer: Carter & Burgess, Inc.
Architect: McCullough & Associates
General Contractor: Walker Construction
Contract Amount: $921,156
Mechanical Designer: Baird Hampton Brown
Architect: Quorum Architects
General Contractor: Linbeck Construction
Contract Amount: $260,000
Mechanical Designer: Carter & Burgess, Inc.
Architect: Morris/Aubry
General Contractor: Walker Construction
Contract Amount: $123,300
Mechanical Designer: Vic Weir
Architect: Nader Design Group
General Contractor: FJW, Inc.
Contract Amount: $1,195,000
Mechanical Designer: Baird-Hampton-Brown
Architect: LBL Architects
General Contractor: FJW, Inc.
Contract Amount: $3,553,096
Mechanical Designer: Walter Cash & Partners
Architect: Paul C. Wharton & Assoc.
General Contractor: Cadenhead Rangaire, Inc.
Contract Amount: $5,770,896
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction
Contract Amount: $242,227
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction
Contract Amount: $1,633,941
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction
Contract Amount: $657,750
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction
Contract Amount: $163,300
Mechanical Designer: CCRD Engineers
Architect: HKS, Inc.
General Contractor: Austin Commercial
General Contractor: MEDCO
Contact: Brian Glass
Contract Amount: $144,416
Mechanical Designer: Baird Hampton Brown
Architect: Quorum Architects
General Contractor: Medco Construction
Contract Amount: $349,750
Mechanical Designer: Smith Seckman Reid, Inc.
Architect: Perkins + Will
General Contractor: Medco Construction
Completion Date: July 2015
Contract Amount: $265,520
General Contractor: Century Mechanical
Contract Amount: $2,500,000
Mechanical Designer: SW Associates
Architect: Perkins + Will
General Contractor: Medco
Contact: Chad Kroeker
Contract Amount: $1,087,322
Mechanical Designer: Summit Consultants
Architect: Gideon Toal
General Contractor: Medco Construction
Completion Date: September 2007
Contract Amount: $363,341
Mechanical Designer: Summit Engineers
General Contractor: Medco Construction
Contract Amount: $12,638,912
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Medco Construction
Completion Date: January 2009
Contract Amount: $2,356,890
Mechanical Designer: CCRD
Architect: HKS
General Contractor: Medco Construction, LLC
Completion Date: March 2017
Contact: Chad Kroeker
Contract Amount: $221,184
Mechanical Designer: Century Mechanical
General Contractor: Baylor/Trammel Crow
Contract Amount: $1,731,454
Mechanical Designer: Meinhart Associates
Architect: Perkins + Will
General Contractor: Medco Construction
Completion Date: June 2009
Contract Amount: $743,330
Mechanical Designer: Baird, Hampton, Brown
Architect: Quorum Architects
General Contractor: Century Mechanical
Contract Amount: $133,336
Mechanical Designer: Summit Consultants
Architect: VLK Architects
General Contractor: Medco Construction
Contract Amount: $99,950
Mechanical Designer: Century Mechanical
General Contractor: Baylor/Trammel Crow
Contract Amount: $661,144
Mechanical Designer: Piazza Engineers
Architect: Odell Associates
General Contractor: Medco Construction
Contract Amount: $736,692
Mechanical Designer: Piazza Engineers
Architect: Odell Associates
General Contractor: Medco Construction
General Contractor: MEDCO
Contact: Brian Glass
Contract Amount: $535,500
Mechanical Designer: CCRD Engineers
Architect: HED
General Contractor: MEDCO Construction
Contract Amount: $3,784,200
Mechanical Designer: Smith Seckman Reid, Inc.
Architect: Perkins + Will
General Contractor: Medco Construction
Completion Date: January 2015
Contract Amount: $958,573
Mechanical Designer: Meinhardt Consulting Engineers
Architect: HDR Architects Inc.
General Contractor: MEDCO Construction
Completion Date: December 2011
Contract Amount: $2,102,750
Mechanical Designer: SWA Associates
Architect: Ascention Group
General Contractor: FJW Company, Inc.
Contact: Rod Campbell
Contract Amount: $222,256
Mechanical Designer: Summit Consultants
Architect: Quorum Architects
General Contractor: Medco Construction
Contract Amount: $1,392,495
Mechanical Designer: CCRD Partners
Architect: Perkins + Will
General Contractor: Perkins + Will
Completion Date: August 2009
Contract Amount: $984,429
Mechanical Designer: Meinhardt
Architect: Ascention Group
General Contractor: Ray F. Skiles Co.
Completion Date: February 2008
Contract Amount: $183,343
Mechanical Designer: Don Penn
Architect: Don Penn
General Contractor: Century Mechanical
Contract Amount: $272,202
Mechanical Designer: Parker Croston Partnership
Architect: Parker Croston Partnership
General Contractor: Cadenhead-Rangaire, Inc.
General Contractor: BTC
Contact: Chad Kroeker
Contract Amount: $350,080
Mechanical Designer: Friberg & Associates
Architect: McCulloch & Associates
General Contractor: Walker Construction Co.
Contract Amount: $1,352,362
Mechanical Designer: Carter-Burgess, Inc.
Architect: Carter-Burgess, Inc.
General Contractor: DeMoss Company
Contract Amount: $1,091,103
Mechanical Designer: Healthcare Envir. Design
Architect: Healthcare Envir. Design
General Contractor: MEDCO Construction
Contract Amount: $4,594,795
Mechanical Designer: O'Connell Robertson
Architect: O'Connell Robertson
General Contractor: Hoar Construction
Completion Date: October 2015
Contract Amount: $1,465,445
Mechanical Designer: O'Connell Robertson & Assoc
Architect: O'Connell Robertson & Assoc
General Contractor: Inman Construction
Contract Amount: $1,926,694
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Geren Associates
General Contractor: Cadenhead Rangaire, Inc.
Contract Amount: $94,460
Mechanical Designer: CCRC
Architect: HKS Architects
General Contractor: Centex Construction
Contract Amount: $325,550
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: The Frymire Co.
Contract Amount: $124,400
Mechanical Designer: Freese & Nichols
Architect: Stichler Design Group
General Contractor: Walker Building Corp.
Contract Amount: $334,400
Mechanical Designer: Engineered Solutions
Architect: Stichler Design Group
General Contractor: The Frymire Company
Contract Amount: $311,100
Mechanical Designer: Stichler Design Group
Architect: Stichler Design Group
General Contractor: The Frymire Company
Contract Amount: $151,184
Mechanical Designer: Engineered Solutions
Architect: Stichler Design Group
General Contractor: The Frymire Company
Contract Amount: $1,013,400
Mechanical Designer: Stichler Design Group
Architect: Stichler Design Group
General Contractor: The Ridgemont Company
Contract Amount: $464,419
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Harris Architectural Services
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $802,601
Mechanical Designer: Jacobs
Architect: Jacobs
General Contractor: Skiles Group
Completion Date: March 2010
Contract Amount: $375,170
Mechanical Designer: I.C. Thomasson Associates, Inc.
Architect: Gresham, Smith and Partners
General Contractor: Rogers-O'Brien Construction
Contact: Jarod O'Neill
Contract Amount: $84,500
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $535,544
Mechanical Designer: Romine & Romine
Architect: Parker/Croston Partnership
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $1,557,987
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $623,380
Mechanical Designer: Friberg Associates
Architect: Harold E. Kaemmerling
General Contractor: TW Foster, Inc.
Contract Amount: $1,236,500
Mechanical Designer: Stichler Design Group
Architect: Stichler Design Group
General Contractor: Frymire Company
Contract Amount: $638,889
Mechanical Designer: Baird, Hampton, Brown
Architect: William Herrington Assoc.
General Contractor: Medco Construction
Contract Amount: $1,000,456
Mechanical Designer: Piazza Engineering
Architect: Freese & Nichols
General Contractor: Medco Construction
Contract Amount: $365,567
Mechanical Designer: LR Klein
Architect: Jackson & Ayers
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $219,985
Mechanical Designer: LR Klein, Jr. PE
Architect: Jackson & Ayers
General Contractor: North Amer. Health Serv.
Contract Amount: $247,704
Mechanical Designer: Century Mechanical
Architect: William A Herrington
General Contractor: The Frymire Company
Contract Amount: $548,869
Mechanical Designer: Friberg Associates
Architect: FSB/Parker Croston
General Contractor: Con-Real Support Group
Contract Amount: $141,120
Mechanical Designer: Friberg Associates
Architect: FSB Parker Croston
General Contractor: Coronado Builders
Architect: Hahnfeld Hoffer Sanford
General Contractor: Medco Construction
Contact: Chad Kroeker
Contract Amount: $582,240
Mechanical Designer: Friberg Associates
Architect: FSB/Parker Croston
General Contractor: Con-Real Support Group
Contract Amount: $115,500
Mechanical Designer: Friberg Associates
Architect: FSB/Parker Croston
General Contractor: Century Mechanical
Contract Amount: $184,470
Mechanical Designer: Baird-Hampton-Brown
Architect: Quorum Architects
General Contractor: Fisher-Pearson, Inc.
Contract Amount: $290,000
Mechanical Designer: Baird-Hampton-Brown
Architect: Tom Malone
General Contractor: Fisher Pearson, Inc.
Contract Amount: $452,202
Mechanical Designer: Meinhardt
Architect: Ascention Group
General Contractor: Ray F. Skiles Company
Completion Date: April 2008
Contract Amount: $665,583
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates/CRS
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $136,692
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Associates
General Contractor: Fisher Pearson, Inc.
Contract Amount: $122,074
Mechanical Designer: Summit Engineering
Architect: Schwarz/Hanson
General Contractor: The Skiles Group
Completion Date: September 2014
Contract Amount: $229,990
Mechanical Designer: Baird Hampton Brown
Architect: FRS Design Group
General Contractor: Webb General Contractors
Contract Amount: $1,509,000
Mechanical Designer: Baird, Hampton, Brown
Architect: Ascension Group
General Contractor: Hill & Wilkinson
Contract Amount: $2,743,475
Mechanical Designer: SWA Associates
Architect: Mike Hale Architects
General Contractor: The Skiles Group
Completion Date: August 2014
Contract Amount: $419,948
Mechanical Designer: Wells Doak
Architect: O'Brien Partnership
General Contractor: Westland Construction
Contract Amount: $163,323
Mechanical Designer: Yandell & Hiller
Architect: Parker/Croton Partnership
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $1,297,265
Mechanical Designer: William K. Hall
Architect: Baylor University Medical Center Arch. Services
General Contractor: MEDCO Construction Div.
Contract Amount: $804,450
Mechanical Designer: Baird, Hampton, Brown
Architect: Komatsu/Rangel
General Contractor: Ed Parker & Associates
Contract Amount: $212,350
Mechanical Designer: CCRD Partners
Architect: HKS, Inc.
General Contractor: Skiles Group
Completion Date: December 2012
Contract Amount: $1,887,000
Mechanical Designer: The Colley Associates
Architect: The Colley Associates
General Contractor: Rogers-O'Brien Constr.
Contract Amount: $1,200,000
Mechanical Designer: HDR Architects
Architect: HDR Architects
General Contractor: MEDCO Construction
Architect: Hereford Dooley Architects
General Contractor: The Broaddus Construction, LLC
Contact: Chad Kroeker
Architect: Hereford Dooley Architects
General Contractor: The Broaddus Construction
Contact: Chad Kroeker
Contact: Chad Kroeker
Contract Amount: $11,570,082
Mechanical Designer: Page Southerland Page
Architect: Page Southerland Page
General Contractor: Linbeck Construction
Completion Date: December 2013
Contract Amount: $2,070,000
Mechanical Designer: Envision
Architect: Ascension Group Architects, LLP
General Contractor: Robins-Morton
Completion Date: October 2014
Contract Amount: $866,619
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Mitchell Enterprises
Contract Amount: $3,371,405
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Mitchell Enterprises
Contract Amount: $131,122
Mechanical Designer: Fratto Engineering
Architect: Sterling Barnett Little
General Contractor: Roy Anderson Construction
Contract Amount: $96,426
Mechanical Designer: Bell Helicopter
Architect: Bell Helicopter
General Contractor: Resorcon
Contract Amount: $888,849
Mechanical Designer: Love, Friberg
Architect: Harry J. Allison
General Contractor: NUCO Industries, Inc.
Contact: Jarod O'Neill
Contract Amount: $1,587,000
Mechanical Designer: Summit Engineers
Architect: Hahnfeld Hofer Stanford
General Contractor: Steele-Freeman, Inc.
Completion Date: June 2017
Contact: Jarod O'Neill
Architect: Vitok Engineers
General Contractor: Century Mechanical
Contact: Jarod O'Neill
Architect: Vitok Engineers
General Contractor: Century Mechanical
Contact: Jarod O'Neill
Architect: GHAFARI Associates, LLC
General Contractor: Steele & Freeman, Inc.
Contact: Jarod O'Neill
Contract Amount: $832,350
Mechanical Designer: Baird Hampton Brown
General Contractor: DeMoss Company
Completion Date: December 2012
Mechanical Designer: Baird Hampton Brown
Architect: Baird Hampton Brown
General Contractor: Century Mechanical Contractors, Inc.
Contact: Jarod O'Neill
Contract Amount: $4,951,093
Mechanical Designer: Baird Hampton Brown
Architect: Baird Hampton Brown
General Contractor: Century Mechanical
Completion Date: December 2016
Contact: Jarod O'Neill
Contract Amount: $660,000
Mechanical Designer: Lampe-Speck
Architect: Frank L. Meier
General Contractor: Spaw Glass, Inc.
Contract Amount: $109,930
Mechanical Designer: Carter Burgess
Architect: Kirk-Voich-Gist
General Contractor: Cadenhead-Rangaire, Inc.
Mechanical Designer: Design Group Facility Solutions
General Contractor: Barry Wehmiller Design Group
Contact: Jarod O'Neill
General Contractor: Dennis Group
Contact: Jarod O'Neill
Contract Amount: $504,400
Mechanical Designer: Wells/Doak
Architect: Harry H. Allison
General Contractor: Bob McCaslin Construction
Contract Amount: $153,973
Mechanical Designer: Delphey/Gerdes Engineering
Architect: Delphey/Gerdes Engineering
General Contractor: DeMoss Company
Completion Date: June 2011
General Contractor: Dennis Engineering Group
Contact: Drew Rome
Mechanical Designer: PKMR Engineers
Architect: Finkle+Williams Architecture
General Contractor: Brinkmann Constructors
Contact: Chad Kroeker
General Contractor: Century Mechanical Contractors, Inc.
Contact: Jarod O'Neill
Contract Amount: $903,352
Mechanical Designer: Campos Engineering
Architect: Huitt-Zollars
General Contractor: Coronado Builders
Contract Amount: $642,219
Mechanical Designer: Wells-Doak
Architect: Halbach, Dietz, Inc.
General Contractor: Bob Moore Construction
Contract Amount: $1,159,161
Mechanical Designer: Smith Duncan
Architect: PLM Design
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $149,993
Mechanical Designer: Smith Duncan
Architect: PLM Design
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $1,134,803
Mechanical Designer: Smith Duncan
Architect: PLM Design
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $660,043
Mechanical Designer: Surgikos
Architect: Century Mechanical
General Contractor: Century Mechanical
Contract Amount: $416,633
Mechanical Designer: The Colley Associates
Architect: The Colley Associates
General Contractor: Rogers-O'Brien Constr.
Contract Amount: $1,880,649
Mechanical Designer: The Colley Associates
Architect: The Colley Associates
General Contractor: Rogers-O'Brien Constr.
Contract Amount: $175,573
Mechanical Designer: TI Facilities
Architect: TI Facilities
General Contractor: Texas Instruments
Contract Amount: $186,667
Mechanical Designer: TI Facilities
Architect: Omni Plan, Inc.
General Contractor: Walker Construction Co.
Contract Amount: $220,080
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Rogers-O'Brien Constr.
Contract Amount: $163,350
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Rogers-O'Brien Constr.
Contract Amount: $42,827
Mechanical Designer: Albert S. Komatsu
General Contractor: Walker Construction Co.
Contract Amount: $100,027
Mechanical Designer: Ridgeway & Associates
Architect: Albert S. Komatsu
General Contractor: Walker Construction Co.
Contract Amount: $857,787
Mechanical Designer: Ridgeway & Associates
Architect: Komatsu & Associates
General Contractor: Walker Construction Co.
Contract Amount: $80,197
Mechanical Designer: Wells Doak
Architect: Albert S. Komatsu
General Contractor: Walker Construction Co.
Contract Amount: $367,743
Mechanical Designer: Ridgeway & Associates
Architect: Albert S. Komatsu
General Contractor: Walker Construction Co.
Contract Amount: $634,433
Mechanical Designer: Friberg & Associates
Architect: Friberg & Associates
General Contractor: Thos. S. Byrne, Inc.
Contract Amount: $164,483
Mechanical Designer: B.E.P.
Architect: B.E.P.
General Contractor: Walker Building Corp.
Contract Amount: $1,275,000
Mechanical Designer: RH George
Architect: VLK Architects
General Contractor: Walker Building Corp
Contract Amount: $329,950
Mechanical Designer: Friberg Associates
Architect: Friberg Associates
General Contractor: Century Mechanical
Contract Amount: $2,472,178
Mechanical Designer: SHW Group
Architect: SHW Group
General Contractor: Charter Builders, Inc.
Completion Date: August 2010
Contract Amount: $605,525
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Douglas Barnhart, Inc.
Contact: Chad Kroeker
Contract Amount: $487,745
Mechanical Designer: Walter Cash & Partners
Architect: Wharton & Lam
General Contractor: Ed A. Wilson, Inc.
Contract Amount: $3,590,685
General Contractor: Buford Thompson
Completion Date: August 2017
Contact: John Heiser
General Contractor: Trane
Contact: John Heiser
General Contractor: Aledo ISD
Contact: John Heiser
Contract Amount: $235,575
Mechanical Designer: Eisenbeck
Architect: Welch & Hampton
General Contractor: KA Sparks Contractor
Contract Amount: $2,471,000
Mechanical Designer: Image Engineering Group
Architect: Huckabee
General Contractor: Lee Lewis Construction Company
Contract Amount: $397,622
Mechanical Designer: Baird, Hampton & Brown
Architect: Hanfeld Hoffer Stanford
General Contractor: Steele & Freeman Inc.
Completion Date: May 2013
Contract Amount: $1,803,208
Mechanical Designer: Baird, Hampton, Brown
Architect: Hahnfeld, Hoffer, Stanford
General Contractor: Steele Freeman, Inc.
Contract Amount: $2,276,100
Mechanical Designer: Image Engineering Group
Architect: Corgan
General Contractor: CORE Construction
Completion Date: May 2015
Contract Amount: $2,589,875
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction
Contract Amount: $1,509,669
Mechanical Designer: Don Penn Engineers
Architect: Corgan Associates
General Contractor: Coronado Builders
Contract Amount: $340,037
Mechanical Designer: Love, Friberg
Architect: Geren Associates
General Contractor: Pete Durant & Associates
Contract Amount: $405,550
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction
Contract Amount: $595,576
Mechanical Designer: Turner Engineers
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.
Contract Amount: $1,775,000
Mechanical Designer: Romine Romine and Burgess
Architect: Huckabee
General Contractor: Ratcliff Constructors
Completion Date: August 2016
Contact: Nathan Livingston
Contract Amount: $1,585,835
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $349,900
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical
Contract Amount: $5,299,750
Mechanical Designer: Don Penn
Architect: SHW Group
General Contractor: Charter Builders
Contract Amount: $761,100
Mechanical Designer: Image Engineering
Architect: Image Engineering
General Contractor: Century Mechanical Contractors
Contract Amount: $2,271,249
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2007
Contract Amount: $944,471
Mechanical Designer: Don Penn
Architect: Corgan Associates
General Contractor: Cadence McShane Corp.
Contract Amount: $248,889
Mechanical Designer: Romine & Romine
Architect: Parker/Croston Partnership
General Contractor: Smithfield Construction
Contract Amount: $1,267,864
Mechanical Designer: R H George
Architect: VLK Architects
General Contractor: Reeder General Contractors
Completion Date: September 2009
Contract Amount: $4,122,350
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Charter Builders
Completion Date: December 2011
Contract Amount: $11,693,873
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: December 2008
Contract Amount: $798,836
Mechanical Designer: Campos Engineering
Architect: Claycomb Associates
General Contractor: DSA, Inc.
Contract Amount: $601,110
Mechanical Designer: Lawrence White
Architect: Buford & Work, Inc.
General Contractor: NUCO Industries, Inc.
Contract Amount: $323,375
Mechanical Designer: Eisenbeck
Architect: Welch & Hampton
General Contractor: Smithfield Construction
Contract Amount: $150,700
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Charter Builders
Completion Date: August 2010
Contract Amount: $621,450
Mechanical Designer: Image Engineering Group, Ltd.
Architect: Stantec
General Contractor: Balfour Beatty Construction
Contact: Chad Kroeker
Contract Amount: $679,948
Mechanical Designer: Estes, McClure Associates
Architect: SHW Group
General Contractor: Hunt Construction
Contract Amount: $12,923,528
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Charter Builders, Inc.
Completion Date: August 2009
Contract Amount: $2,119,366
Mechanical Designer: Image Engineering
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Completion Date: August 2009
Contract Amount: $2,917,092
Mechanical Designer: Image Engineering
Architect: SHW Group
General Contractor: Cadence McShane Inc.
Completion Date: November 2008
Contract Amount: $1,396,000
Mechanical Designer: Wells-Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Mitchell Enterprises
Contract Amount: $2,056,900
Mechanical Designer: Wells-Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Buford-Thompson Inc.
Contract Amount: $2,775,460
Mechanical Designer: Romine, Romine and Burgess
Architect: Natex Architects
General Contractor: Bartlett Cocke, LP
Completion Date: August 2011
Architect: Huckabee & Associates
General Contractor: Pogue Construction
Contact: Jarod O'Neill
Contract Amount: $2,082,800
Mechanical Designer: WRA
Architect: Estes, McClure & Associates
General Contractor: Steele Freeman Inc
Completion Date: August 2013
Contract Amount: $14,286,195
Mechanical Designer: Image Engineering
Architect: SHW Group
General Contractor: Charter Builders Inc.
Completion Date: September 2010
Contract Amount: $164,428
Mechanical Designer: Image Engineering
Architect: Corgan Associates
General Contractor: Core Construction
Completion Date: January 2008
Contract Amount: $5,702,403
Mechanical Designer: Reed, Wells, Benson
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $527,776
Mechanical Designer: Reed, Wells, Benson
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $1,163,000
Mechanical Designer: K-12 Design
Architect: K-12 Design
General Contractor: Diversified Construction
Contract Amount: $246,645
Mechanical Designer: Caffee-Sayers
Architect: John R. Thompson Partners
General Contractor: DSA, Inc.
Contract Amount: $2,128,325
Mechanical Designer: Image Engineering
Architect: SHW Group
General Contractor: Charter Builders Inc.
Completion Date: December 2009
General Contractor: Northstar Builders Group
Contact: John Heiser
Contract Amount: $945,517
Mechanical Designer: Don Penn Associates
Architect: Darrow-McSpedden-Sellars
General Contractor: Lee Lewis Construction
Contract Amount: $261,100
Mechanical Designer: Schutts, Magee & Riddle
Architect: Schutts, Magee & Riddle
General Contractor: Linbeck Construction
Contract Amount: $286,610
Mechanical Designer: Carter Burgess, Inc.
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.
Contact: Chad Kroeker
Contract Amount: $2,244,816
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates Inc.
General Contractor: Cadence McShane Corp.
Completion Date: August 2016
Contact: Mike Beebe
General Contractor: Century Mechanical Contractors, Inc.
Contact: Jarod O'Neill
Contract Amount: $223,380
Mechanical Designer: Sam Toub & Associates
Architect: JR Osborne Architects
General Contractor: Marathon Contractors, Inc.
Contract Amount: $1,268,640
Mechanical Designer: Don Penn & Associates
Architect: PBK Architects
General Contractor: Dal Mac Construction
Architect: VLK Architects, Inc.
General Contractor: Steele & Freeman, Inc.
Contact: Chad Kroeker
Contact: Chad Kroeker
Contract Amount: $1,273,101
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.
General Contractor: Steele & Freeman, Inc.
Contact: Chad Kroeker
Contract Amount: $237,500
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan
General Contractor: Lincoln Builders of Texas, Inc.
Completion Date: August 2015
Contract Amount: $257,650
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2011
Contract Amount: $1,380,723
Mechanical Designer: Don Penn Associates
Architect: PBK Architects
General Contractor: Charter Builders, Inc.
Contract Amount: $1,700,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2013
Contract Amount: $838,864
Mechanical Designer: Love, Friberg
Architect: Dockstader Partnership
General Contractor: Walker Construction Co.
Contract Amount: $478,890
Mechanical Designer: Estes McClure & Assoc.
Architect: SHW Group
General Contractor: Hunt Construction
Contract Amount: $7,137,691
Mechanical Designer: Estes, McClure & Associates
Architect: SHW Group, Inc.
General Contractor: Hunt Construction
Architect: Stantec Architecture, Inc.
General Contractor: Jackson Construction
Contact: Chad Kroeker
General Contractor: Pogue Construction
Contact: Drew Rome
Contract Amount: $1,570,000
Mechanical Designer: Wells-Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Gamma Construction
Contract Amount: $2,090,550
Mechanical Designer: Reed Wells Benson
Architect: V-L-K Architects
General Contractor: Steele-Freeman, Inc.
Completion Date: May 2008
Contract Amount: $1,163,000
Mechanical Designer: K-12 Design
Architect: K-12 Design
General Contractor: Diversified Construction
Contract Amount: $1,268,640
Mechanical Designer: Don Penn & Associates
Architect: PBK Architects
General Contractor: Dal Mac Construction
Contract Amount: $2,048,000
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Buford-Thompson
Contract Amount: $2,925,000
Mechanical Designer: Estes McClure
Architect: SHW Group
General Contractor: Charter Builders, Inc.
Completion Date: May 2009
General Contractor: Balfour Beatty
Contact: John Heiser
Contract Amount: $743,368
Mechanical Designer: Frank W. Neal & Associates
Architect: Hahnfeld Associates
General Contractor: T.W. Gilmore, Inc.
Contract Amount: $503,330
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction
Contract Amount: $2,629,189
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2010
Contract Amount: $381,101
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Component Construction
Contract Amount: $1,112,822
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders, Inc.
Completion Date: August 2009
Contact: Chris Goodman
Contract Amount: $1,141,000
Mechanical Designer: Bennet - Benner Partners
Architect: Baird, Hampton & Brown, Inc.
General Contractor: Lincoln Builders of Texas, Inc.
Completion Date: August 2016
Contact: Bill Jones
Contract Amount: $365,500
Mechanical Designer: Don Penn
Architect: Vestal-Loftis-Kalista
General Contractor: Century Mechanical
Contract Amount: $1,822,816
Mechanical Designer: Don Penn Engineers
Architect: Corgan Associates
General Contractor: Cadence McShane Corp.
Contract Amount: $1,250,593
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $1,723,241
Mechanical Designer: Maloney & Associates
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Contract Amount: $83,387
Mechanical Designer: Don Penn Engineers
Architect: SHW Group
General Contractor: Charter Builders
Contract Amount: $625,500
Mechanical Designer: Sam Toub & Associates
Architect: Corgan Associates
General Contractor: The Cadence Group
Contract Amount: $1,632,036
Mechanical Designer: Sam Toub & Associates
Architect: Corgan Associates
General Contractor: The Cadence Group
General Contractor: Core Construction
Contact: John Heiser
Contract Amount: $484,485
Mechanical Designer: Don Penn Engineers
Architect: SHW Group
General Contractor: Charter Builders
Contract Amount: $2,306,300
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Ratcliff Construction
Completion Date: June 2017
Contact: Mike Beebe
Contract Amount: $2,306,300
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Ratcliff Construction
Completion Date: June 2017
Contact: Mike Beebe
Contract Amount: $1,789,000
Mechanical Designer: Wells Doak Engineering, Inc.
Architect: Hahnfeld Hofer Stanford
Completion Date: June 2016
Contact: Jarod O'Neill
Contract Amount: $2,500,000
Mechanical Designer: Image Engineering Group
Architect: Huckagee & Associates
General Contractor: Lee Lewis Construction
Completion Date: August 2016
Contact: Mike Beebe
Contract Amount: $314,400
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical
General Contractor: Lincoln Builders
Contract Amount: $2,194,400
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: October 2012
Contract Amount: $2,074,123
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Douglas Barnhart, Inc.
Contract Amount: $2,074,762
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Douglas Barnhart, Inc.
Contract Amount: $774,000
Mechanical Designer: Romine, Romine & Burgess, Inc.
Architect: Corgan Associates
General Contractor: Lincoln Builders of Texas, Inc.
Contact: Bill Jones
Contract Amount: $774,000
Mechanical Designer: Romine, Romine & Burgess, Inc.
Architect: Corgan Associates, Inc.
General Contractor: Lincoln Builders of Texas, Inc.
Contact: Bill Jones
Contract Amount: $214,479
Mechanical Designer: Adams, Reid
Architect: Huppelshueser-Darrow
General Contractor: KA Sparks Contractor
Contract Amount: $3,090,949
Mechanical Designer: Reed, Wells & Benson
Architect: VLK Architects
General Contractor: Cadence-McShane Corp
Contract Amount: $2,276,370
Mechanical Designer: Don Penn
Architect: Corgan Associates
General Contractor: Lee Lewis Construction
Contract Amount: $583,356
Mechanical Designer: Romine, Romine & Burgess
Architect: Komatsu & Associates
General Contractor: Hancon Corporation
Contact: Jarod O'Neill
Contract Amount: $3,234,630
Mechanical Designer: Lampe - Speck
Architect: Vestal-Loftis-Kalista
General Contractor: Dal-Mac, Inc.
Contract Amount: $1,864,038
Mechanical Designer: MEP Consultants
Architect: Hahnfeld Associates
General Contractor: Thos. S. Byrne, Inc.
Completion Date: August 2010
Contract Amount: $346,607
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Ed A. Wilson, Inc.
Architect: Stantec Architecture, Inc.
General Contractor: Jackson Construction
Contact: Chad Kroeker
Contract Amount: $247,746
Mechanical Designer: Romine, Romine & Burgess
Architect: Century Mechanical
General Contractor: Century Mechanical
Contact: Chris Goodman
Contract Amount: $7,934,224
Mechanical Designer: Image Engineering
Architect: SHW Architects
General Contractor: Lee Lewis Construction
Completion Date: August 2009
General Contractor: Jackson Construction
Completion Date: August 2018
Contact: Chad Kroeker
Contract Amount: $1,125,257
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Architect: Stantec Architecture, Inc.
General Contractor: Jackson Construction
Contact: Chad Kroeker
Contract Amount: $595,500
Mechanical Designer: Image Engineering, Inc.
Architect: Huckabee
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2016
Contact: Chad Kroeker
Contract Amount: $255,590
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical
Contact: John Heiser
Contract Amount: $1,314,347
Mechanical Designer: Image Engineering Group
Architect: HKS, Inc.
General Contractor: Key Construction, Inc.
Mechanical Designer: Image Engineering Group
Architect: Stantec Architecture, Inc.
General Contractor: Cadence McShane Construction
Contact: Chad Kroeker
Contract Amount: $1,723,409
Mechanical Designer: Maloney & Associates
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Contract Amount: $9,280,994
Mechanical Designer: IEG Engineers
Architect: Corgan Associates
General Contractor: Lee Lewis Construction
Completion Date: July 2014
Contract Amount: $1,828,500
Mechanical Designer: Wells Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Steele-Freeman, Inc.
Contract Amount: $686,640
Mechanical Designer: Wells Doak
Architect: Gideon Toal
General Contractor: Steele Freeman, Inc.
Contact: Chris Goodman
Architect: WRA Architects, Inc.
General Contractor: Buford-Thompson Company
Contact: Jarod O'Neill
Contract Amount: $1,434,000
Mechanical Designer: Don Penn
Architect: Corgan Associates
General Contractor: Hisaw & Associates
Contract Amount: $2,471,000
Mechanical Designer: Image Engineering Group
Architect: Huckabee & Associates
General Contractor: Lee Lewis Construction
Completion Date: July 2014
Contract Amount: $2,286,573
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction
General Contractor: Lincoln Builders of Texas
Contact: Bill Jones
Contract Amount: $2,252,816
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates Inc.
General Contractor: Cadence McShane Corporation
Completion Date: August 2016
Contact: Mike Beebe
Contract Amount: $4,125,120
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates Inc.
General Contractor: Steele-Freeman, Inc.
Completion Date: December 2016
Contact: Chad Kroeker
Contract Amount: $2,423,250
Mechanical Designer: Image Engineering Group, Ltd.
Architect: Corgan Associates, Inc.
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2016
Contact: Chad Kroeker
Contract Amount: $441,141
Mechanical Designer: Wells Doak
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Contract Amount: $346,640
Mechanical Designer: Byron Folse Architects
Architect: Byron Folse Architects
General Contractor: R. C. Small & Associates
General Contractor: BTC
Contact: Chris Goodman
Architect: VLK Architects, Inc.
General Contractor: BTC
Contact: Chris Goodman
Contract Amount: $1,135,870
Mechanical Designer: Dale Caffey
Architect: ARB Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $1,268,640
Mechanical Designer: Don Penn & Associates
Architect: PBK Architects
General Contractor: Dal Mac Construction
Contract Amount: $4,073,906
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Charter Builders
Completion Date: August 2011
Contract Amount: $845,593
Mechanical Designer: Don Penn
Architect: Darrow,McSpedden.Sellars
General Contractor: Lee Lewis Construction
Contract Amount: $3,100,818
Mechanical Designer: Don Penn
Architect: DMS Architects
General Contractor: Lee Lewis Construction
Contract Amount: $8,696,938
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lee Lewis Construction
Completion Date: August 2012
Contract Amount: $1,735,800
Mechanical Designer: Friberg & Associates
Architect: Corgan Associates
General Contractor: Lee Lewis Construction
Contract Amount: $1,221,500
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Charter Builders
Contract Amount: $2,124,746
Mechanical Designer: Estes McClure
Architect: HKS Architects
General Contractor: Satterfield & Pontikes
Completion Date: March 2009
Architect: Estes, McClure & Associates
General Contractor: Lincoln Builders of Texas, Inc.
Contact: Bill Jones
Contract Amount: $375,570
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction
Contract Amount: $1,734,474
Mechanical Designer: Baird, Hampton, Brown
Architect: Hahnfeld, Hoffer, Stanford
General Contractor: Steele Freeman, Inc.
Contract Amount: $862,294
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders, Inc.
Contract Amount: $6,994,035
Mechanical Designer: Image Group (Don Penn)
Architect: SHW Architects
General Contractor: Charter Builders, Inc.
Completion Date: October 2008
Architect: PBK
General Contractor: Bartlett Cocke General Contractors
Contact: Chad Kroeker
Contract Amount: $4,206,000
Mechanical Designer: DFW Consulting
Architect: Beck Architecture
General Contractor: Beck Group
Completion Date: September 2015
Contract Amount: $1,435,800
Mechanical Designer: Don Penn
Architect: Corgan Associates
General Contractor: Hisaw & Associates
Contract Amount: $1,126,183
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $6,447,572
Mechanical Designer: Image Engineering
Architect: SHW Architects
General Contractor: Hunt Construction Group
Completion Date: August 2009
Architect: Huckabee, Inc.
General Contractor: Lee Lewis Construction, Inc.
Contact: John Heiser
Contract Amount: $850,000
Mechanical Designer: Multatech Engineering
Architect: Wharton & Lam
General Contractor: RE Hable Co.
Contract Amount: $676,615
Mechanical Designer: LBL Architects
Architect: LBL Architects
General Contractor: Westland Construction
Contract Amount: $686,004
Mechanical Designer: Engineering Associates
General Contractor: Century Mechanical
Completion Date: August 2012
Architect: Huckabee & Associates
General Contractor: Core Construction
Contact: John Heiser
Contract Amount: $1,830,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2013
Contract Amount: $241,164
Mechanical Designer: Don Penn & Associates
Architect: Robert Graham with BISD
General Contractor: Component Construction
Mechanical Designer: Image Engineering Group
Architect: CORGAN
Contact: John Heiser
General Contractor: Northstar Builders Group, Inc.
Contact: Mike Beebe
Contact: Chad Kroeker
Architect: VLK Architects, Inc.
General Contractor: Core Construction
Contact: Chad Kroeker
Contract Amount: $2,795,367
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction
General Contractor: Steele & Freeman, Inc.
Contact: Chad Kroeker
Contract Amount: $641,163
Mechanical Designer: Turner Engineers
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.
Contract Amount: $220,000
Mechanical Designer: Don Penn
Architect: SHW Group
General Contractor: Component Construction
Contract Amount: $448,895
Mechanical Designer: Don Penn & Associates
Architect: Don Penn & Associates
General Contractor: Century Mechanical
Contract Amount: $1,024,000
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Steele and Freeman Inc.
Architect: EMA Engineering & Consultants, Inc.
General Contractor: Century Mechanical Contractors, Inc.
Contact: Jarod O'Neill
General Contractor: BTC
Contact: Jarod O'Neill
Architect: Huckabee, Inc.
General Contractor: Lee Lewis Construction, Inc.
Contact: John Heiser
Contract Amount: $345,500
Mechanical Designer: Don Penn
Architect: SHW Group
General Contractor: Century Mechanical
Contract Amount: $579,500
Mechanical Designer: Image Engineering Group, Ltd.
Architect: Huckabee
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2016
Contact: Chad Kroeker
Contract Amount: $2,061,677
Mechanical Designer: Image Engineering
Architect: VLK Architects
General Contractor: Buford Thompson Company
Completion Date: December 2008
Contract Amount: $562,200
Mechanical Designer: Leon R. Biddy
Architect: Harper, Perkins Architects
General Contractor: Westland Construction
Contract Amount: $977,700
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Associates
General Contractor: Buford-Thompson, Inc.
Architect: Huckabee & Associates
General Contractor: Pogue Construction
Contact: Jarod O'Neill
Contract Amount: $1,919,864
Mechanical Designer: Estes McClure & Associates
Architect: SHW Group
General Contractor: Charter Builders
Completion Date: August 2010
Contract Amount: $1,435,800
Mechanical Designer: Don Penn
Architect: Corgan Associates
General Contractor: Hisaw & Associates
General Contractor: Pogue Construction
Contact: Jarod O'Neill
Contact: Chad Kroeker
Contract Amount: $7,252,079
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Cadence McShane Corp
Completion Date: July 2010
Contract Amount: $10,247,990
Mechanical Designer: Image Engineering Group
Architect: SHW Group
General Contractor: Lee Lewis Construction
Completion Date: August 2015
Contact: Mike Beebe
Contract Amount: $981,128
Mechanical Designer: Don Penn
Architect: Corgan Associates
General Contractor: Cadence McShane Corp.
Contract Amount: $2,535,358
Mechanical Designer: Reed, Wells Benson
Architect: VLK Architects
General Contractor: Steele Freeman Inc
Completion Date: August 2011
Contract Amount: $1,730,132
Mechanical Designer: Don Penn Engineers
Architect: Corgan Associates
General Contractor: Charter Builders
Contract Amount: $730,494
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: October 2012
Contract Amount: $196,688
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Wharton & Lam
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $2,420,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Plyler Construction
Contract Amount: $2,155,673
Mechanical Designer: Image Engineering
Architect: Corgan Associates
General Contractor: Hisaw & Associates
Completion Date: August 2009
Architect: Huckabee & Associates
General Contractor: Pogue Construction
Contact: Jarod O'Neill
Contract Amount: $2,149,591
Mechanical Designer: Don Penn Engineers
Architect: DMS Architects
General Contractor: Lee Lewis Construction
Architect: VLK Architects, Inc.
General Contractor: Cadence McShane
Contact: Jarod O'Neill
Contract Amount: $1,247,700
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Mitchell Enterprises
Contract Amount: $131,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: September 2011
Contract Amount: $907,750
Mechanical Designer: Don Penn & Associates
Architect: SHW Group
General Contractor: Component Construction
Contract Amount: $483,343
Mechanical Designer: IEG
Architect: HKS Architects
General Contractor: Modern Contractors
Contract Amount: $305,500
Mechanical Designer: Sam Toub & Associates
Architect: Corgan Associates
General Contractor: Buford-Thompson
Contract Amount: $1,147,496
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2010
Contract Amount: $718,878
Mechanical Designer: Wells-Doak
Architect: O'Brien Partnership
General Contractor: Coronado Builders
Contact: John Heiser
Contract Amount: $3,014,447
Mechanical Designer: Image Engineering
Architect: Corgan Associates
General Contractor: Charter Builders, Inc.
Completion Date: May 2009
Contract Amount: $120,000
Mechanical Designer: Don Penn
Architect: SHW Architects
General Contractor: Charter Builders
Contact: Jarod O'Neill
Contract Amount: $2,288,000
Mechanical Designer: IEG Engineers
Architect: Huckabee & Associates
General Contractor: Lee Lewis Construction
Completion Date: August 2013
Contract Amount: $5,221,901
Mechanical Designer: Friberg Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Thos. S. Byrne, Inc.
Contract Amount: $346,640
Mechanical Designer: Freese & Nichols
Architect: Lockwook, Andrews, Neuman
General Contractor: Linbeck Construction
Contract Amount: $11,044,642
Mechanical Designer: Image Engineering
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Completion Date: December 2009
Contract Amount: $1,247,700
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Mitchell Enterprises
Contract Amount: $4,150,759
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Hoffer Stanford
General Contractor: Steele Freeman Inc.
Completion Date: August 2010
Contract Amount: $249,620
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: LIncoln Builders
Completion Date: August 2010
Contract Amount: $1,864,553
Mechanical Designer: Baird, Hampton, Brown
Architect: Hahnfeld Associates
General Contractor: Steele Freeman, Inc.
Contract Amount: $2,573,152
Mechanical Designer: Image Group (Don Penn)
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Contract Amount: $686,206
Mechanical Designer: Image Engineering
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.
Completion Date: July 2009
Architect: Stantec Architecture, Inc.
General Contractor: Jackson Construction
Contact: Chad Kroeker
Contract Amount: $377,727
Mechanical Designer: Adams, Reid
Architect: Hahnfeld Associates
General Contractor: Cadenhead-Rangaire, Inc.
Contract Amount: $4,113,650
Mechanical Designer: Reed Wells Benson
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2017
Contact: Chad Kroeker
Contract Amount: $2,386,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Natex Architects
General Contractor: AUI Contractors, Inc.
Completion Date: August 2011
Contract Amount: $255,590
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical
Contract Amount: $612,207
Mechanical Designer: Friberg Associates
Architect: Friberg Associates
General Contractor: Century Mechanical
General Contractor: BTC
Contact: Chris Goodman
Contract Amount: $1,221,500
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Charter Builders
Contract Amount: $661,169
Mechanical Designer: Turner Engineers
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.
Contract Amount: $1,163,000
Mechanical Designer: K-12 Design
Architect: K-12 Design
General Contractor: Diversified Construction
Contact: Chad Kroeker
Architect: Huckabee & Associates
General Contractor: Bartlett Cocke General Contractors
Contact: Jarod O'Neill
Architect: Corgan
General Contractor: Joeris General Contractors
Contact: John Heiser
Contract Amount: $317,700
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Component Construction
Contract Amount: $1,076,132
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Pete Durant & Associates
Contract Amount: $711,195
Mechanical Designer: Wells-Doak
Architect: O'Brien Partnership
General Contractor: Coronado Builders
Contract Amount: $1,585,835
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Contract Amount: $1,024,823
Mechanical Designer: Love, Friberg
Architect: Geren Associates
General Contractor: Walker Construction Co.
Contract Amount: $5,793,823
Mechanical Designer: Barsharkhah Engineering
Architect: Perkins Will
General Contractor: Rogers-O'Brien Construction
Completion Date: May 2012