HVAC & Plumbing

Commercial HVAC Systems

Century Mechanical Contractors has installed various types of mechanical systems during its lifetime.  We have experience installing chilled water systems, water source heat pumps, rooftop systems and ductless split systems among many others.  We have experience with specialized kitchen exhaust, laboratory exhaust, welding exhaust and vehicle exhaust systems.  Century has been involved in projects ranging from a single unit change to projects in excess of 2500 tons.

Century Mechanical provides skilled tradesman to install all the piping systems involved in even the most complicated mechanical system.  We then work with local sheet metal, insulation and controls companies to provide a complete mechanical system that will provide the customer with a quality system for years to come.

Specialized Medical Installations

Since the inception of Century Mechanical Contractors, we have served medical facilities.  Many of our superintendents are focused on installing mechanical systems in these facilities.  No matter how complicated or specialized the mechanical needs of a medical facility are, we are committed to providing the necessary manpower and expertise to install the system to meet the clients needs.  We have participated in plant upgrades, OR, CT,  and MRI installation, isolation rooms and humidity control projects.

Commercial Plumbing

Commercial plumbing systems provide the unseen infrastructure required to maintain a commercial building and provide a successful working building.  Century Mechanical Contractors has a full team of licensed plumbers and apprentices that are ready to install your commercial plumbing project.  We are experienced in installing all types of plumbing systems including acid waste, high purity piping, specialized fixtures and water treatment equipment on top of standard piping systems.

Century Mechanical Contractors utilizes the most current technologies including Viega Pro-Press piping systems and glue joint CPVC acid waste systems to provide the quality product in a timely fashion to meet your needs.

Medical Gas Piping

Many of our licensed plumbers are medical gas certified.  We have participated in small medical gas modifications all the way to complete hospital system installations.  We have the qualified staff and experience to make your medical gas installation a safe and successful system.

Related Projects

3 Schools for Eagle Mtn. - Saginaw ISD

Contract Amount: $1,275,000
Mechanical Designer: RH George
Architect: VLK Architects
General Contractor: Walker Building Corp

5 Arlington Elementary Schools

Contract Amount: $329,950
Mechanical Designer: Friberg Associates
Architect: Friberg Associates
General Contractor: Century Mechanical

Acton Elementary School - Granbury ISD

Contract Amount: $605,525
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Douglas Barnhart, Inc.

Administration Building Tarleton State University

Contract Amount: $511,145
Mechanical Designer: Geren Associates/CRS
Architect: Geren Associates/CRS
General Contractor: Emerson Construction

Advanced Imaging Center

Contract Amount: $296,671
Mechanical Designer: Freese-Nichols
Architect: Freese-Nichols
General Contractor: Fisher Pearson, Inc.

AISD Elementary School

Contract Amount: $487,745
Mechanical Designer: Walter Cash & Partners
Architect: Wharton & Lam
General Contractor: Ed A. Wilson, Inc.

Aledo Middle School

Contract Amount: $235,575
Mechanical Designer: Eisenbeck
Architect: Welch & Hampton
General Contractor: KA Sparks Contractor

All Saints Cityview ER & Lab Renovations

Contract Amount: $167,733
Mechanical Designer: Baird-Hampton-Brown
Architect: Quorum Architects
General Contractor: Fisher-Pearson, Inc.

All Saints Gamma Knife Institute

Contract Amount: $155,522
Mechanical Designer: Baird Hampton Brown
Architect: Quorum Architects
General Contractor: Brasfield & Gorrie, LLC

All Saints Hospital

Contract Amount: $2,485,424
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates/CRS
General Contractor: Walker Construction

All Saints Hospital CRFC Addition & Renovation

Contract Amount: $828,865
Mechanical Designer: CCRD Engineers
Architect: HKS Architects
General Contractor: Walker/Turner Joint Venture

All Saints Hospital - CVR

Contract Amount: $303,325
Mechanical Designer: CCRD Engineers
Architect: HKS Architects
General Contractor: Walker/Turner Joint Venture

All Saints Hospital - MACC Bldg.

Contract Amount: $127,779
Mechanical Designer: Baird-Hampton-Brown
Architect: Quorum Architects
General Contractor: Fisher Pearson, Inc.

All Saints Hospital - OR Addition

Contract Amount: $301,151
Mechanical Designer: CCRD Engineers
Architect: HKS Architects
General Contractor: Walker/Turner Joint Venture

All Saints Hospital Cardiac Cath Lab

Contract Amount: $231,100
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Walker Building Corp.

All Saints Hospital Cardiothoracic Suites

Contract Amount: $361,100
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Walker Building Corp.

All Saints Hospital CCA-East

Contract Amount: $379,911
Mechanical Designer: Carter & Burgess, Inc.
Architect: Morris/Aubry
General Contractor: Walker Construction

All Saints Hospital Cooling Tower

Contract Amount: $554,465
Mechanical Designer: Baird Hampton Brown
Architect: Baird Hampton Brown
General Contractor: Century Mechanical

All Saints Hospital Emergency Room Renovation

Contract Amount: $127,750
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Walker Building Corp.

All Saints Hospital Engery Conservation

Contract Amount: $476,696
Mechanical Designer: CES Way
Architect: CES Way
General Contractor: CES Way International

All Saints Hospital Labor, Delivery & Recovery

Contract Amount: $832,238
Mechanical Designer: Carter & Burgess, Inc.
Architect: McCullough & Associates
General Contractor: Walker Construction

All Saints Hospital Primary Care Unit

Contract Amount: $921,156
Mechanical Designer: Baird Hampton Brown
Architect: Quorum Architects
General Contractor: Linbeck Construction

All Saints Hospital Underfloor Piping

Contract Amount: $260,000
Mechanical Designer: Carter & Burgess, Inc.
Architect: Morris/Aubry
General Contractor: Walker Construction

All Saints Professional Building

Contract Amount: $123,300
Mechanical Designer: Vic Weir
Architect: Nader Design Group
General Contractor: FJW, Inc.

Arlington Admin. Building

Contract Amount: $276,684
Mechanical Designer: Adams, Reid
Architect: Geren Associates
General Contractor: Smithfield Construction

Arlington Memorial Floors 33 & 34

Contract Amount: $1,195,000
Mechanical Designer: Baird-Hampton-Brown
Architect: LBL Architects
General Contractor: FJW, Inc.

Arlington Memorial Hospital

Contract Amount: $3,553,096
Mechanical Designer: Walter Cash & Partners
Architect: Paul C. Wharton & Assoc.
General Contractor: Cadenhead Rangaire, Inc.

Arlington Memorial Hospital

Contract Amount: $5,770,896
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction

Arlington Memorial Hospital Cardiac Cath & Autopsy

Contract Amount: $242,227
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction

Arlington Memorial Hospital Medical Office Building

Contract Amount: $1,633,941
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction

Arlington Memorial Hospital Outpatient Center

Contract Amount: $657,750
Mechanical Designer: Robert Frias
Architect: Wharton & Lam
General Contractor: Cadenhead Construction

Arlington Memorial South Hospital

Contract Amount: $163,300
Mechanical Designer: CCRD Engineers
Architect: HKS, Inc.
General Contractor: Austin Commercial

Arnold Middle School - Grand Prairie ISD

Contract Amount: $2,589,875
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction

Atherton Elementary School

Contract Amount: $340,037
Mechanical Designer: Love, Friberg
Architect: Geren Associates
General Contractor: Pete Durant & Associates

Austin Elementary School - Grand Prairie ISD

Contract Amount: $405,550
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction

Baylor All Saints - Inpatient Rehab

Contract Amount: $144,416
Mechanical Designer: Baird Hampton Brown
Architect: Quorum Architects
General Contractor: Medco Construction

Baylor All Saints - MRI Renovation

Contract Amount: $349,750
Mechanical Designer: Smith Seckman Reid, Inc.
Architect: Perkins + Will
General Contractor: Medco Construction
Completion Date: July 2015

Baylor All Saints 5th Floor Renovations

Contract Amount: $265,520
General Contractor: Century Mechanical

Baylor All Saints 7th Floor Oncology

Contract Amount: $1,087,322
Mechanical Designer: Summit Consultants
Architect: Gideon Toal
General Contractor: Medco Construction
Completion Date: September 2007

Baylor All Saints A Building 3 Story Addition

Contract Amount: $363,341
Mechanical Designer: Summit Engineers
General Contractor: Medco Construction

Baylor All Saints Andrews Womens Hospital

Contract Amount: $12,638,912
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Medco Construction
Completion Date: January 2009

Baylor All Saints ED Expansion

Contract Amount: $2,356,890
Mechanical Designer: CCRD
Architect: HKS
General Contractor: Medco Construction, LLC
Completion Date: March 2017
Contact: Chad Kroeker

Baylor All Saints FW 3rd Floor Renov.

Contract Amount: $221,184
Mechanical Designer: Century Mechanical
General Contractor: Baylor/Trammel Crow

Baylor All Saints Heart Center

Contract Amount: $1,731,454
Mechanical Designer: Meinhart Associates
Architect: Perkins + Will
General Contractor: Medco Construction
Completion Date: June 2009

Baylor All Saints Hospital Bldg C Repipe

Contract Amount: $743,330
Mechanical Designer: Baird, Hampton, Brown
Architect: Quorum Architects
General Contractor: Century Mechanical

Baylor All Saints Parking Garage

Contract Amount: $133,336
Mechanical Designer: Summit Consultants
Architect: VLK Architects
General Contractor: Medco Construction

Baylor Cityview Cooling Tower

Contract Amount: $99,950
Mechanical Designer: Century Mechanical
General Contractor: Baylor/Trammel Crow

Baylor Grapevine, 2nd Floor

Contract Amount: $661,144
Mechanical Designer: Piazza Engineers
Architect: Odell Associates
General Contractor: Medco Construction

Baylor Grapevine, 3rd Floor

Contract Amount: $736,692
Mechanical Designer: Piazza Engineers
Architect: Odell Associates
General Contractor: Medco Construction

Baylor Institute of Metabolic Disease

Contract Amount: $535,500
Mechanical Designer: CCRD Engineers
Architect: HED
General Contractor: MEDCO Construction

Baylor Irving - ER Renovation

Contract Amount: $3,784,200
Mechanical Designer: Smith Seckman Reid, Inc.
Architect: Perkins + Will
General Contractor: Medco Construction
Completion Date: January 2015

Baylor Medical Center - 6th Floor Ortho Renovation

Contract Amount: $958,573
Mechanical Designer: Meinhardt Consulting Engineers
Architect: HDR Architects Inc.
General Contractor: MEDCO Construction
Completion Date: December 2011

Baylor Orthopedic & Spine Hospital @ Arlington, TX

Contract Amount: $2,102,750
Mechanical Designer: SWA Associates
Architect: Ascention Group
General Contractor: FJW Company, Inc.
Contact: Rod Campbell

Baylor Southwest CCC Additions

Contract Amount: $222,256
Mechanical Designer: Summit Consultants
Architect: Quorum Architects
General Contractor: Medco Construction

Baylor Southwest ED Expansion

Contract Amount: $1,392,495
Mechanical Designer: CCRD Partners
Architect: Perkins + Will
General Contractor: Perkins + Will
Completion Date: August 2009

Baylor Surgicare at Oakmont

Contract Amount: $984,429
Mechanical Designer: Meinhardt
Architect: Ascention Group
General Contractor: Ray F. Skiles Co.
Completion Date: February 2008

Bell Helicopter

Contract Amount: $96,426
Mechanical Designer: Bell Helicopter
Architect: Bell Helicopter
General Contractor: Resorcon

Bell Manor Elementary - HEB ISD

Contract Amount: $595,576
Mechanical Designer: Turner Engineers
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.

Ben Barber CTA Additions

Contract Amount: $1,775,000
Mechanical Designer: Romine Romine and Burgess
Architect: Huckabee
General Contractor: Ratcliff Constructors
Completion Date: August 2016
Contact: Nathan Livingston

Bette Perot Elementary School - Keller ISD

Contract Amount: $1,585,835
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.

Birdville Elementary

Contract Amount: $349,900
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical

Birdville ISD HVAC Upgrades

Contract Amount: $183,343
Mechanical Designer: Don Penn
Architect: Don Penn
General Contractor: Century Mechanical

Birdville ISD-Northride, Hardeman Schools

Contract Amount: $761,100
Mechanical Designer: Image Engineering
Architect: Image Engineering
General Contractor: Century Mechanical Contractors

Bishop Davies Nursing Center

Contract Amount: $272,202
Mechanical Designer: Parker Croston Partnership
Architect: Parker Croston Partnership
General Contractor: Cadenhead-Rangaire, Inc.

Boswell Gymnasium

Contract Amount: $248,889
Mechanical Designer: Romine & Romine
Architect: Parker/Croston Partnership
General Contractor: Smithfield Construction

Boswell High School Renovations

Contract Amount: $1,267,864
Mechanical Designer: R H George
Architect: VLK Architects
General Contractor: Reeder General Contractors
Completion Date: September 2009

Bowie Middle School Additions & Renovations - Irving ISD

Contract Amount: $4,122,350
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Charter Builders
Completion Date: December 2011

Bridgeport High School

Contract Amount: $798,836
Mechanical Designer: Campos Engineering
Architect: Claycomb Associates
General Contractor: DSA, Inc.

Bryson Elementary

Contract Amount: $601,110
Mechanical Designer: Lawrence White
Architect: Buford & Work, Inc.
General Contractor: NUCO Industries, Inc.

Burleson High School

Contract Amount: $323,375
Mechanical Designer: Eisenbeck
Architect: Welch & Hampton
General Contractor: Smithfield Construction

Burleson High School Admin Addition - Burleson ISD

Contract Amount: $150,700
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Charter Builders
Completion Date: August 2010

Burleson STEAM Middle School

Contract Amount: $621,450
Mechanical Designer: Image Engineering Group, Ltd.
Architect: Stantec
General Contractor: Balfour Beatty Construction
Contact: Chad Kroeker

Burnett Animal Science Center

Contract Amount: $680,000
Mechanical Designer: Blum
Architect: Halbach Dietz
General Contractor: The Frymire Comany

Business Admin. Building Tarleton State University

Contract Amount: $933,337
Mechanical Designer: William K. Hall
Architect: Dahl Braden PTM
General Contractor: Rodgers Construction

Byrd, Reed, Kennemer Middle Schools Duncanville ISD

Contract Amount: $679,948
Mechanical Designer: Estes, McClure Associates
Architect: SHW Group
General Contractor: Hunt Construction

Campbell Memorial Hospital

Contract Amount: $350,080
Mechanical Designer: Friberg & Associates
Architect: McCulloch & Associates
General Contractor: Walker Construction Co.

Career & Tech Building - Frisco ISD

Contract Amount: $2,917,092
Mechanical Designer: Image Engineering
Architect: SHW Group
General Contractor: Cadence McShane Inc.
Completion Date: November 2008

Carroll Elementary/Inter.

Contract Amount: $1,396,000
Mechanical Designer: Wells-Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Mitchell Enterprises

Carroll Junior High School

Contract Amount: $2,056,900
Mechanical Designer: Wells-Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Buford-Thompson Inc.

Carter Blood Center

Contract Amount: $1,352,362
Mechanical Designer: Carter-Burgess, Inc.
Architect: Carter-Burgess, Inc.
General Contractor: DeMoss Company

Cash America Team Conference Center

Contract Amount: $366,000
Mechanical Designer: Jacobs Engineering Group
Architect: Jacobs Engineering Group
General Contractor: DeMoss Company
Completion Date: May 2014

Castleberry Elementary - Castelberry ISD

Contract Amount: $2,082,800
Mechanical Designer: WRA
Architect: Estes, McClure & Associates
General Contractor: Steele Freeman Inc
Completion Date: August 2013

Central High School - Keller ISD

Contract Amount: $5,702,403
Mechanical Designer: Reed, Wells, Benson
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.

Central High School Site Work - Keller ISD

Contract Amount: $527,776
Mechanical Designer: Reed, Wells, Benson
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.

Central Middle School - Northwest ISD

Contract Amount: $1,163,000
Mechanical Designer: K-12 Design
Architect: K-12 Design
General Contractor: Diversified Construction

Cleburne High School

Contract Amount: $246,645
Mechanical Designer: Caffee-Sayers
Architect: John R. Thompson Partners
General Contractor: DSA, Inc.

Colonial Country Club Renovations

Contract Amount: $195,000
Mechanical Designer: Jordan & Skala Engineers
Architect: Marsh & Associates, Inc.
General Contractor: Scott Tucker Construction Co.
Completion Date: May 2015

Corinth Primary School

Contract Amount: $945,517
Mechanical Designer: Don Penn Associates
Architect: Darrow-McSpedden-Sellars
General Contractor: Lee Lewis Construction

Country Day Lower School

Contract Amount: $261,100
Mechanical Designer: Schutts, Magee & Riddle
Architect: Schutts, Magee & Riddle
General Contractor: Linbeck Construction

Country Day School

Contract Amount: $286,610
Mechanical Designer: Carter Burgess, Inc.
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.

Crestview Elementary School - Graham ISD

Contract Amount: $223,380
Mechanical Designer: Sam Toub & Associates
Architect: JR Osborne Architects
General Contractor: Marathon Contractors, Inc.

Crockett Elementary School - Grand Prairie ISD

Contract Amount: $1,268,640
Mechanical Designer: Don Penn & Associates
Architect: PBK Architects
General Contractor: Dal Mac Construction

Crowley High School

Contract Amount: $1,273,101
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.

David Crockett Early Education - Grand Prairie ISD

Contract Amount: $237,500
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan
General Contractor: Lincoln Builders of Texas, Inc.
Completion Date: August 2015

David Daniels Elementary Addition - Grand Prairie ISD

Contract Amount: $257,650
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2011

David Daniels Elementary School

Contract Amount: $1,380,723
Mechanical Designer: Don Penn Associates
Architect: PBK Architects
General Contractor: Charter Builders, Inc.

De Zavala Elementary School - Grand Prairie ISD

Contract Amount: $1,700,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2013

Decatur Hospital

Contract Amount: $1,091,103
Mechanical Designer: Healthcare Envir. Design
Architect: Healthcare Envir. Design
General Contractor: MEDCO Construction

Dick Smith Library Tarleton State University

Contract Amount: $506,628
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Darrow-McSpedden-Sellers
General Contractor: Emerson Construction

Double Eagle Office First Floor Remodel

Contract Amount: $224,700
Mechanical Designer: Summit Consultants
Architect: Bennett Benner Partners
General Contractor: Scott Tucker Construction Co
Completion Date: January 2015

Dunbar Middle School

Contract Amount: $838,864
Mechanical Designer: Love, Friberg
Architect: Dockstader Partnership
General Contractor: Walker Construction Co.

Duncanville Central Production Kitchen

Contract Amount: $478,890
Mechanical Designer: Estes McClure & Assoc.
Architect: SHW Group
General Contractor: Hunt Construction

Duncanville High School

Contract Amount: $7,137,691
Mechanical Designer: Estes, McClure & Associates
Architect: SHW Group, Inc.
General Contractor: Hunt Construction

Eagle Mountain-Saginaw Middle School

Contract Amount: $1,570,000
Mechanical Designer: Wells-Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Gamma Construction

East Middle School - Northwest ISD

Contract Amount: $1,163,000
Mechanical Designer: K-12 Design
Architect: K-12 Design
General Contractor: Diversified Construction

Edelweiss Elementary School - Grand Prairie ISD

Contract Amount: $1,268,640
Mechanical Designer: Don Penn & Associates
Architect: PBK Architects
General Contractor: Dal Mac Construction

Emma Ousley Junior High

Contract Amount: $2,048,000
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Buford-Thompson

Euless Park Place POB

Contract Amount: $743,368
Mechanical Designer: Frank W. Neal & Associates
Architect: Hahnfeld Associates
General Contractor: T.W. Gilmore, Inc.

Fannin Elementary School - Grand Prairie ISD

Contract Amount: $503,330
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction

Fannin Middle School Renovations - Grand Prairie ISD

Contract Amount: $2,629,189
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2010

Ferrell Elementary

Contract Amount: $381,101
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Component Construction

Fine Arts Academy - White Settlement ISD

Contract Amount: $1,112,822
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders, Inc.
Completion Date: August 2009

Fire Training Center - TCC NW

Contract Amount: $1,286,477
Mechanical Designer: Romine,Romine & Burgess
Architect: PBK Architects
General Contractor: Charter Builders, Inc.

Firestone Robertson Distillery

Contract Amount: $1,587,000
Mechanical Designer: Summit Engineers
Architect: Hahnfeld Hofer Stanford
General Contractor: Steele-Freeman, Inc.
Completion Date: June 2017
Contact: Jarod O'Neill

Firestone Robertson Process

Architect: Vitok Engineers
General Contractor: Century Mechanical
Contact: Jarod O'Neill

Firestone Robertson Tanks

Architect: Vitok Engineers
General Contractor: Century Mechanical
Contact: Jarod O'Neill

First Baptist Church of Burleson Event Center

Contract Amount: $484,900
Mechanical Designer: Systems Associates
Architect: Form Studios Inc.
General Contractor: FBC of Burleson
Completion Date: May 2014

First Presbyterian Church Fort Worth

Contract Amount: $2,701,648
Mechanical Designer: Baird, Hampton, Brown
Architect: Hahnfeld Associates
General Contractor: Steele Freeman, Inc.
Completion Date: February 2009

First United Bank Operations Center

Contract Amount: $572,227
Mechanical Designer: Carter Burgess, Inc.
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.

First United Methodist Church of Hurst

Contract Amount: $492,282
Mechanical Designer: Baird-Hampton-Brown
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.

Fort Worth Club Modifications

Contract Amount: $776,601
Mechanical Designer: Friberg Associates
Architect: ID & A Associates
General Contractor: The Frymire Company

Fort Worth Country Day - Fieldhouse

Contract Amount: $1,141,000
Mechanical Designer: Bennet - Benner Partners
Architect: Baird, Hampton & Brown, Inc.
General Contractor: Lincoln Builders of Texas, Inc.
Completion Date: August 2016
Contact: Bill Jones

Freedom Elementary - Keller ISD

Contract Amount: $1,250,593
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.

Friendship Elementary School - Keller ISD

Contract Amount: $1,723,241
Mechanical Designer: Maloney & Associates
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.

Frisco Admin Concessions

Contract Amount: $83,387
Mechanical Designer: Don Penn Engineers
Architect: SHW Group
General Contractor: Charter Builders

Frisco Elementary School

Contract Amount: $625,500
Mechanical Designer: Sam Toub & Associates
Architect: Corgan Associates
General Contractor: The Cadence Group

Frisco High School

Contract Amount: $1,632,036
Mechanical Designer: Sam Toub & Associates
Architect: Corgan Associates
General Contractor: The Cadence Group

Frisco ISD Administration Annex

Contract Amount: $484,485
Mechanical Designer: Don Penn Engineers
Architect: SHW Group
General Contractor: Charter Builders

Frisco ISD Elementary #41

Contract Amount: $2,306,300
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Ratcliff Construction
Completion Date: June 2017
Contact: Mike Beebe

Frisco ISD Elementary #42

Contract Amount: $2,306,300
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates
General Contractor: Ratcliff Construction
Completion Date: June 2017
Contact: Mike Beebe

FWISD HVAC Upgrade to Administration Building

Contract Amount: $1,789,000
Mechanical Designer: Wells Doak Engineering, Inc.
Architect: Hahnfeld Hofer Stanford
Completion Date: June 2016
Contact: Jarod O'Neill

Gatorade Line 5- Building/Mechanical

Contract Amount: $4,951,093
Mechanical Designer: Baird Hampton Brown
Architect: Baird Hampton Brown
General Contractor: Century Mechanical
Completion Date: December 2016
Contact: Jarod O'Neill

Glenview Elementary

Contract Amount: $314,400
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical

GPHS Classroom Tower Additions

General Contractor: Lincoln Builders

GPISD 2012 HVAC and Roof Replacement

Contract Amount: $2,194,400
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: October 2012

Graham Regional Medical Center

Contract Amount: $1,465,445
Mechanical Designer: O'Connell Robertson & Assoc
Architect: O'Connell Robertson & Assoc
General Contractor: Inman Construction

Granbury Middle School East Site

Contract Amount: $2,074,123
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Douglas Barnhart, Inc.

Granbury Middle School West Site

Contract Amount: $2,074,762
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Douglas Barnhart, Inc.

Grand Prairie High School Fieldhouse and Gym Addition

Contract Amount: $774,000
Mechanical Designer: Romine, Romine & Burgess, Inc.
Architect: Corgan Associates
General Contractor: Lincoln Builders of Texas, Inc.
Contact: Bill Jones

Grand Prairie ISD Fieldhouse

Contract Amount: $774,000
Mechanical Designer: Romine, Romine & Burgess, Inc.
Architect: Corgan Associates, Inc.
General Contractor: Lincoln Builders of Texas, Inc.
Contact: Bill Jones

Grapevine High School

Contract Amount: $214,479
Mechanical Designer: Adams, Reid
Architect: Huppelshueser-Darrow
General Contractor: KA Sparks Contractor

Grapevine Middle School

Contract Amount: $3,090,949
Mechanical Designer: Reed, Wells & Benson
Architect: VLK Architects
General Contractor: Cadence-McShane Corp

Handley Middle School

Contract Amount: $583,356
Mechanical Designer: Romine, Romine & Burgess
Architect: Komatsu & Associates
General Contractor: Hancon Corporation

Harris Graphics

Contract Amount: $504,400
Mechanical Designer: Wells/Doak
Architect: Harry H. Allison
General Contractor: Bob McCaslin Construction

Harris Hospital

Contract Amount: $1,926,694
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Geren Associates
General Contractor: Cadenhead Rangaire, Inc.

Harris Hospital Parking Garage

Contract Amount: $94,460
Mechanical Designer: CCRC
Architect: HKS Architects
General Contractor: Centex Construction

Harris Methodist HEB - ICU

Contract Amount: $325,550
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: The Frymire Co.

Harris Methodist Heliport

Contract Amount: $124,400
Mechanical Designer: Freese & Nichols
Architect: Stichler Design Group
General Contractor: Walker Building Corp.

Harris Methodist Hospital

Contract Amount: $334,400
Mechanical Designer: Engineered Solutions
Architect: Stichler Design Group
General Contractor: The Frymire Company

Harris Methodist Hospital - NICU

Contract Amount: $311,100
Mechanical Designer: Stichler Design Group
Architect: Stichler Design Group
General Contractor: The Frymire Company

Harris Methodist Hospital Phase B - Stephenville

Contract Amount: $151,184
Mechanical Designer: Engineered Solutions
Architect: Stichler Design Group
General Contractor: The Frymire Company

Harris NICU Phase II

Contract Amount: $1,013,400
Mechanical Designer: Stichler Design Group
Architect: Stichler Design Group
General Contractor: The Ridgemont Company

Harris Reference Lab Bldg.

Contract Amount: $464,419
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Harris Architectural Services
General Contractor: Cadenhead-Rangaire, Inc.

Harris SW Hospital Chiller Addition

Contract Amount: $802,601
Mechanical Designer: Jacobs
Architect: Jacobs
General Contractor: Skiles Group
Completion Date: March 2010

Harwood & Nichols J.H.S.

Contract Amount: $3,234,630
Mechanical Designer: Lampe - Speck
Architect: Vestal-Loftis-Kalista
General Contractor: Dal-Mac, Inc.

Hazel Harvey Peace Elementary School - Fort Worth ISD

Contract Amount: $1,864,038
Mechanical Designer: MEP Consultants
Architect: Hahnfeld Associates
General Contractor: Thos. S. Byrne, Inc.
Completion Date: August 2010

HCA Medical Plaza - 3rd Floor Rehab Renovation

Contract Amount: $375,170
Mechanical Designer: I.C. Thomasson Associates, Inc.
Architect: Gresham, Smith and Partners
General Contractor: Rogers-O'Brien Construction
Contact: Jarod O'Neill

HEB Cancer Center

Contract Amount: $84,500
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Ed A. Wilson, Inc.

HEB Cooling Tower

Contract Amount: $346,607
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Ed A. Wilson, Inc.

HEB Hospital

Contract Amount: $535,544
Mechanical Designer: Romine & Romine
Architect: Parker/Croston Partnership
General Contractor: Cadenhead-Rangaire, Inc.

HEB Psychiatric Hospital

Contract Amount: $1,557,987
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Ed A. Wilson, Inc.

Heights/McDonald Schools

Contract Amount: $247,746
Mechanical Designer: Romine, Romine & Burgess
Architect: Century Mechanical
General Contractor: Century Mechanical

Heritage Bank

Contract Amount: $215,500
Mechanical Designer: Clint Hulsey
Architect: J. Douglas Cain & Associates
General Contractor: Webb General Contractors

Hidden Lakes Elementary - Keller ISD

Contract Amount: $1,125,257
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.

Hillwood Middle School - Keller ISD

Contract Amount: $595,500
Mechanical Designer: Image Engineering, Inc.
Architect: Huckabee
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2016
Contact: Chad Kroeker

Holiday Heights Elementary

Contract Amount: $255,590
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical

Home for Aged Masons

Contract Amount: $623,380
Mechanical Designer: Friberg Associates
Architect: Harold E. Kaemmerling
General Contractor: TW Foster, Inc.

Houston General Insurance Co.

Contract Amount: $1,559,747
Mechanical Designer: Geren Associates/CRS
Architect: Geren Associates/CRS
General Contractor: Walker Construction Co.

Huguley Hospital ER/MOB

Contract Amount: $1,236,500
Mechanical Designer: Stichler Design Group
Architect: Stichler Design Group
General Contractor: Frymire Company

Huguley Hospital MOB 4

Contract Amount: $638,889
Mechanical Designer: Baird, Hampton, Brown
Architect: William Herrington Assoc.
General Contractor: Medco Construction

Huguley Hospital Renovations

Contract Amount: $1,000,456
Mechanical Designer: Piazza Engineering
Architect: Freese & Nichols
General Contractor: Medco Construction

Huguley Memorial Hospital

Contract Amount: $365,567
Mechanical Designer: LR Klein
Architect: Jackson & Ayers
General Contractor: Cadenhead-Rangaire, Inc.

Huguley Memorial Hospital Medical Office Building

Contract Amount: $219,985
Mechanical Designer: LR Klein, Jr. PE
Architect: Jackson & Ayers
General Contractor: North Amer. Health Serv.

Huguley MOB 3rd Floor Lease Spaces

Contract Amount: $247,704
Mechanical Designer: Century Mechanical
Architect: William A Herrington
General Contractor: The Frymire Company

Hurst Police Center

Contract Amount: $326,674
Mechanical Designer: Interfield Consultants
Architect: Parkey & Partners
General Contractor: Smithfield Construction

Hurst Public Library

Contract Amount: $227,756
Mechanical Designer: Love, Friberg
Architect: Komatsu & Associates
General Contractor: Walker Construction Co.

Independence Elementary School - Keller ISD

Contract Amount: $1,723,409
Mechanical Designer: Maloney & Associates
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.

Indian Springs Middle School - Keller ISD

Contract Amount: $1,828,500
Mechanical Designer: Wells Doak
Architect: Vestal-Loftis-Kalista
General Contractor: Steele-Freeman, Inc.

Indian Springs Middle School Addition - Keller ISD

Contract Amount: $686,640
Mechanical Designer: Wells Doak
Architect: Gideon Toal
General Contractor: Steele Freeman, Inc.

Jackson Middle School - Grand Prairie ISD

Contract Amount: $2,286,573
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction

John Peter Smith Hospital AIDS Inpatient Center

Contract Amount: $548,869
Mechanical Designer: Friberg Associates
Architect: FSB/Parker Croston
General Contractor: Con-Real Support Group

John Peter Smith Hospital Pain Management Center

Contract Amount: $141,120
Mechanical Designer: Friberg Associates
Architect: FSB Parker Croston
General Contractor: Coronado Builders

Johnson County Adult Probation

Contract Amount: $553,500
Mechanical Designer: Wells Doak Engineering
Architect: Magee Architects
General Contractor: Pete Durant
Completion Date: February 2013

Josey Pavilion

Contract Amount: $120,600
Mechanical Designer: TLC Engineering
Architect: Lake/Flat D Architects
General Contractor: Lincoln Builders
Completion Date: May 2014

JPS Floors T9 and T10

Contract Amount: $582,240
Mechanical Designer: Friberg Associates
Architect: FSB/Parker Croston
General Contractor: Con-Real Support Group

JPS Phamacy & Business Office

Contract Amount: $115,500
Mechanical Designer: Friberg Associates
Architect: FSB/Parker Croston
General Contractor: Century Mechanical

Keller CTE High School - Keller ISD

Contract Amount: $4,125,120
Mechanical Designer: Image Engineering Group
Architect: Corgan Associates Inc.
General Contractor: Steele-Freeman, Inc.
Completion Date: December 2016
Contact: Chad Kroeker

Keller High School Kitchen Renovations

Contract Amount: $441,141
Mechanical Designer: Wells Doak
Architect: VLK Architects
General Contractor: Steele Freeman, Inc.

Keller Middle School

Contract Amount: $346,640
Mechanical Designer: Byron Folse Architects
Architect: Byron Folse Architects
General Contractor: R. C. Small & Associates

Keller Middle School - Keller ISD

Contract Amount: $1,135,870
Mechanical Designer: Dale Caffey
Architect: ARB Architects
General Contractor: Steele-Freeman, Inc.

Kirby Elementary School - Grand Prairie ISD

Contract Amount: $1,268,640
Mechanical Designer: Don Penn & Associates
Architect: PBK Architects
General Contractor: Dal Mac Construction

Lake Dallas Athletic Complex

Contract Amount: $845,593
Mechanical Designer: Don Penn
Architect: Darrow,McSpedden.Sellars
General Contractor: Lee Lewis Construction

Lake Ridge High School - Mansfield ISD

Contract Amount: $8,696,938
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lee Lewis Construction
Completion Date: August 2012

Lakewood Village

Contract Amount: $996,600
Mechanical Designer: Century Mechanical
Architect: Haberman Jeffery Dixon
General Contractor: Overcash-Goodman

Lamar High School

Contract Amount: $1,735,800
Mechanical Designer: Friberg & Associates
Architect: Corgan Associates
General Contractor: Lee Lewis Construction

Larson Elementary

Contract Amount: $1,221,500
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Charter Builders

Lee Middle School - Grand Prairie ISD

Contract Amount: $375,570
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction

Liberty Elementary School - White Settlement ISD

Contract Amount: $862,294
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders, Inc.

Life High School - Waxahachie, Texas

Contract Amount: $4,206,000
Mechanical Designer: DFW Consulting
Architect: Beck Architecture
General Contractor: Beck Group
Completion Date: September 2015

Lone Star Elementary School - Keller ISD

Contract Amount: $1,126,183
Mechanical Designer: Maloney Associates
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.

MACC - Dr. Freese's Office

Contract Amount: $184,470
Mechanical Designer: Baird-Hampton-Brown
Architect: Quorum Architects
General Contractor: Fisher-Pearson, Inc.

Mansfield StarCenter

Contract Amount: $1,940,484
General Contractor: Pete Durant & Associates
Completion Date: December 2017
Contact: John Heiser

Martin de Pores Parish Hall/ Ed Bldg

Contract Amount: $1,543,845
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Hofer Stanford
General Contractor: Steele-Freeman, Inc.
Completion Date: June 2017
Contact: Chad Kroeker

Mary Moore Elementary

Contract Amount: $850,000
Mechanical Designer: Multatech Engineering
Architect: Wharton & Lam
General Contractor: RE Hable Co.

Mary Moore Elementary

Contract Amount: $676,615
Mechanical Designer: LBL Architects
Architect: LBL Architects
General Contractor: Westland Construction

Masonic Temple

Contract Amount: $926,671
Mechanical Designer: Romine, Romine & Burgess
Architect: Romine, Romine & Burgess
General Contractor: Century Mechanical

McCarroll Middle School - Decatur ISD

Contract Amount: $686,004
Mechanical Designer: Engineering Associates
General Contractor: Century Mechanical
Completion Date: August 2012

Medcor

Contract Amount: $290,000
Mechanical Designer: Baird-Hampton-Brown
Architect: Tom Malone
General Contractor: Fisher Pearson, Inc.

Medical Centre Surgical Hospital

Contract Amount: $452,202
Mechanical Designer: Meinhardt
Architect: Ascention Group
General Contractor: Ray F. Skiles Company
Completion Date: April 2008

Mercantile Bank

Contract Amount: $1,056,527
Mechanical Designer: DFW Consulting
Architect: Hardy McCullah/MLM Architects
General Contractor: Bob Moore Construction

Milam Elementary School - Grand Prairie ISD

Contract Amount: $1,830,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2013

MIUW Renovations - Naval Air Station

Contract Amount: $361,100
Mechanical Designer: Baird Hampton Brown
Architect: Vidaud & Associates
General Contractor: Mitchell Enterprises

Monastery of The Most Holy Trinity

Contract Amount: $474,441
Mechanical Designer: Brian Berg & Associates
Architect: Williams/Pollock Associates
General Contractor: NUCO Industries

Moncrief Ambulatory

Contract Amount: $665,583
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates/CRS
General Contractor: Cadenhead-Rangaire, Inc.

Moncrief Cancer Center/UT SW

Contract Amount: $136,692
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Associates
General Contractor: Fisher Pearson, Inc.

Moncrief Radiation Center

Contract Amount: $252,223
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Cadenhead-Rangaire, Inc.

Moncrief Radiation Center

Contract Amount: $822,294
Mechanical Designer: Carter-Burgess, Inc.
Architect: Hahnfeld Associates
General Contractor: Linbeck Construction

Monterra Medical Campus MOB's

Contract Amount: $122,074
Mechanical Designer: Summit Engineering
Architect: Schwarz/Hanson
General Contractor: The Skiles Group
Completion Date: September 2014

Ninth Grade Center - Grand Prairie ISD

Contract Amount: $2,795,367
Mechanical Designer: Don Penn
Architect: PBK Architects
General Contractor: Dal-Mac Construction

North Euless Elementary - HEB ISD

Contract Amount: $641,163
Mechanical Designer: Turner Engineers
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.

North Richland Hills Church of Christ

Contract Amount: $1,715,465
Mechanical Designer: Friberg & Associates
Architect: Wharton & Lam
General Contractor: Shoemaker Construction

North Richland Middle School

Contract Amount: $448,895
Mechanical Designer: Don Penn & Associates
Architect: Don Penn & Associates
General Contractor: Century Mechanical

North Riverside Elementary School - Keller ISD

Contract Amount: $1,024,000
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Steele and Freeman Inc.

Osteopathic Hospital - LDR

Contract Amount: $229,990
Mechanical Designer: Baird Hampton Brown
Architect: FRS Design Group
General Contractor: Webb General Contractors

Palo Pinto General Hospital Additions

Contract Amount: $1,509,000
Mechanical Designer: Baird, Hampton, Brown
Architect: Ascension Group
General Contractor: Hill & Wilkinson

Parkway Surgical Hospital

Contract Amount: $2,743,475
Mechanical Designer: SWA Associates
Architect: Mike Hale Architects
General Contractor: The Skiles Group
Completion Date: August 2014

Parkwood Hill Intermediate School - Keller ISD

Contract Amount: $579,500
Mechanical Designer: Image Engineering Group, Ltd.
Architect: Huckabee
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2016
Contact: Chad Kroeker

PE & Intramural Facilities Tarleton State University

Contract Amount: $70,885
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Schrickel Rollins Assoc.
General Contractor: Mission Construction Co.

Peace Lutheran Church

Contract Amount: $634,419
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Associates
General Contractor: Fisher Pearson, Inc.

Peaster Elementary

Contract Amount: $562,200
Mechanical Designer: Leon R. Biddy
Architect: Harper, Perkins Architects
General Contractor: Westland Construction

Performing Arts - Northewst ISD

Contract Amount: $977,700
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Associates
General Contractor: Buford-Thompson, Inc.

Peter's Colony Elementary School - Lewisville ISD

Contract Amount: $1,919,864
Mechanical Designer: Estes McClure & Associates
Architect: SHW Group
General Contractor: Charter Builders
Completion Date: August 2010

S Grand Prairie HS School Coliseum & Band Hall - Grand Prairie ISD

Contract Amount: $730,494
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: October 2012

Sam Houston High School

Contract Amount: $196,688
Mechanical Designer: Friberg, Alexander, Maloney, Gipson & Weir
Architect: Wharton & Lam
General Contractor: Cadenhead-Rangaire, Inc.

Sanger High School

Contract Amount: $2,420,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Plyler Construction

Sanger High School

Contract Amount: $2,561,133
Mechanical Designer: Romine, Romine & Burgess
Architect: Huckabee & Associates
General Contractor: Plyler Construction

Santa Cruz Animal Health

Contract Amount: $981,854
Mechanical Designer: Baird, Hampton & Brown, Inc.
Architect: Quorum Architects, Inc.
General Contractor: The DeMoss Company
Contact: Bill Jones

Silo Road Elementary

Contract Amount: $1,247,700
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Mitchell Enterprises

Sisters of the Holy Family

Contract Amount: $419,948
Mechanical Designer: Wells Doak
Architect: O'Brien Partnership
General Contractor: Westland Construction

Skyline M&O Office Building - Grand Prairie ISD

Contract Amount: $131,000
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: September 2011

Smithfield Middle School

Contract Amount: $907,750
Mechanical Designer: Don Penn & Associates
Architect: SHW Group
General Contractor: Component Construction

Smithfield Middle School - Birdville ISD

Contract Amount: $483,343
Mechanical Designer: IEG
Architect: HKS Architects
General Contractor: Modern Contractors

South Arlington Catholic School

Contract Amount: $305,500
Mechanical Designer: Sam Toub & Associates
Architect: Corgan Associates
General Contractor: Buford-Thompson

South Grand Prairie High School Auditorium Addition

Contract Amount: $1,147,496
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: Lincoln Builders
Completion Date: August 2010

Southwest Library

Contract Amount: $377,705
Mechanical Designer: Romine, Romine & Burgess
Architect: Geren Associates/CRS
General Contractor: McCord-Mendenhall, Inc.

Speers Elementary

Contract Amount: $718,878
Mechanical Designer: Wells-Doak
Architect: O'Brien Partnership
General Contractor: Coronado Builders

Sprint Expansion

Contract Amount: $690,090
Mechanical Designer: Larson, Binkley Assoc.
Architect: Foss, Seligson, Lafferty
General Contractor: MA Mortenson Company

Synagogue

Contract Amount: $345,591
Mechanical Designer: Herman Blum
Architect: Growald
General Contractor: NUCO Industries, Inc.

Tarleton State University Memorial Stadium

Contract Amount: $3,500,000
General Contractor: SEDALCO
Contact: William Jones III

Tarrant County Family Law

Contract Amount: $4,123,000
Mechanical Designer: Summit Engineers
Architect: Gideon Toal, Inc.
General Contractor: Gilbane, Inc.

Tarrant County Jail

Contract Amount: $316,640
Mechanical Designer: Love, Friberg
Architect: Love, Friberg
General Contractor: Century Mechanical

Tarrant County SE Subcourthouse

Contract Amount: $1,184,488
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Hoffer & Stanford
General Contractor: Steele Freeman, Inc.
Completion Date: March 2009

TCC NE Campus Office/Warehouse

Contract Amount: $1,101,039
Mechanical Designer: Friberg Associates
Architect: Komatsu Architects
General Contractor: Coronado Builders

TCCD SE Early College High School

Contract Amount: $1,059,000
Mechanical Designer: Solare Engineering Unlimited
Architect: Perkins + Will
General Contractor: Steele & Freeman Inc.
Completion Date: August 2014

TCJC Lab Renovations

Contract Amount: $177,720
Mechanical Designer: Friberg & Associates
Architect: Friberg & Associates
General Contractor: Century Mechanical

TCJC Police Academy

Contract Amount: $334,491
Mechanical Designer: Friberg Associates
Architect: Kirk Voich Gist
General Contractor: Cadenhead-Rangaire, Inc.

TCJC SE Campus

Contract Amount: $5,221,901
Mechanical Designer: Friberg Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Thos. S. Byrne, Inc.

TCJC South Campus Nursing Bldg. Addition

Contract Amount: $163,323
Mechanical Designer: Yandell & Hiller
Architect: Parker/Croton Partnership
General Contractor: Ed A. Wilson, Inc.

TCU Alumni Center

Contract Amount: $346,640
Mechanical Designer: Freese & Nichols
Architect: Lockwook, Andrews, Neuman
General Contractor: Linbeck Construction

TCU Neeley Building

Contract Amount: $821,155
Mechanical Designer: Romine, Romine & Burgess
Architect: Kirk Voich Gist
General Contractor: Cadenhead-Rangaire, Inc.

TCU Office Annex

Contract Amount: $175,500
Mechanical Designer: Multatech Engineers
Architect: Larry Garrison
General Contractor: R J Miller Construction

Tenery Hospital

Contract Amount: $1,297,265
Mechanical Designer: William K. Hall
Architect: Baylor University Medical Center Arch. Services
General Contractor: MEDCO Construction Div.

Texas Health & Human Services

Contract Amount: $804,450
Mechanical Designer: Baird, Hampton, Brown
Architect: Komatsu/Rangel
General Contractor: Ed Parker & Associates

Texas Health SW Breast Center

Contract Amount: $212,350
Mechanical Designer: CCRD Partners
Architect: HKS, Inc.
General Contractor: Skiles Group
Completion Date: December 2012

The Shops @ Central Park

Contract Amount: $1,532,299
Mechanical Designer: Creative Engineers, Inc.
Architect: RTKL Associates
General Contractor: Walker Construction

Thompson Road Middle School- Keller ISD

Contract Amount: $4,113,650
Mechanical Designer: Reed Wells Benson
Architect: VLK Architects
General Contractor: Steele-Freeman, Inc.
Completion Date: August 2017
Contact: Chad Kroeker

TI East Building 3rd, 4th Floor Renovations

Contract Amount: $416,633
Mechanical Designer: The Colley Associates
Architect: The Colley Associates
General Contractor: Rogers-O'Brien Constr.

TI East Building Support Wings

Contract Amount: $1,880,649
Mechanical Designer: The Colley Associates
Architect: The Colley Associates
General Contractor: Rogers-O'Brien Constr.

TI North Building Dock Addition

Contract Amount: $186,667
Mechanical Designer: TI Facilities
Architect: Omni Plan, Inc.
General Contractor: Walker Construction Co.

TI Spring Creek

Contract Amount: $163,350
Mechanical Designer: Yandell & Hiller
Architect: Yandell & Hiller
General Contractor: Rogers-O'Brien Constr.

Timber Oaks Elementary

Contract Amount: $1,247,700
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Mitchell Enterprises

Timberview Middle School - Keller ISD

Contract Amount: $4,150,759
Mechanical Designer: Baird Hampton Brown
Architect: Hahnfeld Hoffer Stanford
General Contractor: Steele Freeman Inc.
Completion Date: August 2010

TMC Ambulatory Surgery Ctr.

Contract Amount: $1,200,000
Mechanical Designer: HDR Architects
Architect: HDR Architects
General Contractor: MEDCO Construction

Travis Elementary Restoration - Grand Prairie ISD

Contract Amount: $249,620
Mechanical Designer: Romine, Romine & Burgess
Architect: Corgan Associates
General Contractor: LIncoln Builders
Completion Date: August 2010

Trinity Broadcasting Network

Contract Amount: $616,600
Mechanical Designer: Lockwood-Andrews-Newman
Architect: Daniels & Manicom
General Contractor: J. L. Spears, Inc.

Trinity River Authority

Contract Amount: $225,595
Mechanical Designer: Cash/Ridgeway
Architect: Harwood K. Smith
General Contractor: Trinity River Authority

Van Zandt-Guinn Elementary

Contract Amount: $377,727
Mechanical Designer: Adams, Reid
Architect: Hahnfeld Associates
General Contractor: Cadenhead-Rangaire, Inc.

Walnut Hill Physicians Hospital

Contract Amount: $11,570,082
Mechanical Designer: Page Southerland Page
Architect: Page Southerland Page
General Contractor: Linbeck Construction
Completion Date: December 2013

Watauga Elementary

Contract Amount: $255,590
Mechanical Designer: Don Penn Associates
Architect: SHW Group
General Contractor: Century Mechanical

Wayside Middle School

Contract Amount: $612,207
Mechanical Designer: Friberg Associates
Architect: Friberg Associates
General Contractor: Century Mechanical

Weatherford RMC - Geripsych Ward

Contract Amount: $2,070,000
Mechanical Designer: Envision
Architect: Ascension Group Architects, LLP
General Contractor: Robins-Morton
Completion Date: October 2014

West Elementary

Contract Amount: $1,221,500
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Charter Builders

West Hurst Elementary - HEB ISD

Contract Amount: $661,169
Mechanical Designer: Turner Engineers
Architect: Hahnfeld Associates
General Contractor: Steele-Freeman, Inc.

West Middle School - Northwest ISD

Contract Amount: $1,163,000
Mechanical Designer: K-12 Design
Architect: K-12 Design
General Contractor: Diversified Construction

Wilkerson-Greines Activity Ctr.

Contract Amount: $1,186,387
Mechanical Designer: Carter Burgess, Inc.
Architect: Geren Associates
General Contractor: Cadenhead-Rangaire, Inc.

Williams Elementary

Contract Amount: $317,700
Mechanical Designer: Maloney & Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Component Construction

Williamson Dickie Distribution Center

Contract Amount: $579,980
Mechanical Designer: Friberg Associates
Architect: Dockstader Partnership
General Contractor: Bob Moore Construction

Willis Lane ELementary

Contract Amount: $1,076,132
Mechanical Designer: Maloney Associates
Architect: Vestal-Loftis-Kalista
General Contractor: Pete Durant & Associates

Wilson Jones Hospital - Women's Center

Contract Amount: $866,619
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Mitchell Enterprises

Wilson Jones Memorial Hospital

Contract Amount: $3,371,405
Mechanical Designer: Page-Southerland-Page
Architect: Page-Southerland-Page
General Contractor: Mitchell Enterprises

Wilson Jones Parking Garage

Contract Amount: $131,122
Mechanical Designer: Fratto Engineering
Architect: Sterling Barnett Little
General Contractor: Roy Anderson Construction

Wimbish Elementary

Contract Amount: $711,195
Mechanical Designer: Wells-Doak
Architect: O'Brien Partnership
General Contractor: Coronado Builders

Y.M.C.A.

Contract Amount: $749,964
Mechanical Designer: William K. Hall
Architect: Hahnfeld Associates
General Contractor: Cadenhead-Rangaire, Inc.

Young Junior High School

Contract Amount: $1,024,823
Mechanical Designer: Love, Friberg
Architect: Geren Associates
General Contractor: Walker Construction Co.

No matter what your HVAC, Plumbing or Specialized Mechanical system needs are, Century Mechanical has the skills and manpower available to help you install a successful project.